
Prerequisites
1-3
_
______________________________________________________________________________________
_
______________________________________________________________________________________
_
______________________________________________________________________________________
IDENTIFYING FACTORY-ASSEMBLED (ALT) SYSTEMS
If your customer ordered the complete hardware platform (an AT&T 6386 WGS) with the AUDIX Voice
Power R3.0 package, the AT&T factory has preassembled much of the hardware and all of the software as
part of the assemble, load, and test (ALT) process. The factory identifies ALT systems by placing an
orange sticker over the door of the floppy disk drive.
Before beginning the installation, look for this sticker. If it is present, the procedures in Chapter 2,
Preparing the Mother Board, and Chapter 3, Installing Circuit Boards, have been completed at the factory.
You will only have to make the necessary connections to the switch and peripherals and perform the
required testing.
If you are installing an ALT system, skip the next two chapters. Begin with Chapter 4, Making System
Connections, and continue to the end of this document.