Installation & Servicing instructions ATAG iC-Range
45
15.2 Checking fl ue integrity
The integrity of the fl ue system and performance of the boiler can be checked via the fl ue turret sample
points shown in diagram 15.2.a.
The case must be on the boiler and the boiler made to run at maximum output.
- Press both + buttons for 6 seconds (this will only give full CH output);
- When the fl ame symbol appears in the display press both + buttons again for 6 seconds;
- The display shows the supply water temperature ( appears in the display)
The boiler will switch to maximum power output of the boiler
- Press 1x the eco- button;
The display shows XX% (heating capacity)
- Insert the analyser probe into the air intake sample point 'B'.
- Ensure the probe reaches into the fl ow of air in air intake sample point. Ensure the sealing cone on the
probe is sealed to the sample point and correctly position the end of the probe.
- Allow the readings to stabilise and check that:
-
O
2
is equal to, or greater than 20.6%.
-
CO
2
is less than 0.2%
- If the readings are outside these limits then this indicates that there is a problem with the fl ue system or
combustion circuit, e.g. missing or dislodged seals.
End of measuring:
- Press the ESC button (
button).
The device switches off .
The display shows for 2 seconds code 180 or 181.
This completes the procedure.
A – Flue gas sample point
B – Air intake sample point
Figure 15.2.a
A
6 sec.
B
Summary of Contents for iC 24
Page 33: ...Installation Servicing instructions ATAG iC Range 33 Figure 10 7 a 10 9 Electrical diagram...
Page 56: ...Installation Servicing instructions ATAG iC Range 56 Annex C Short parts list...
Page 57: ...Installation Servicing instructions ATAG iC Range 57...
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......