
Installation & Servicing instructions ATAG iC-Range
13
8.1
Wall frame
- Position the boiler frame against the wall using the template and a level.
- Use the level for horizontal positioning and checking the vertical position.
- Drill 4x ø10mm holes, 60mm deep
- Press the nylon wall plug (ø10x55mm) in the holes
- Mount the boiler frame to wall with the 4 coach screws (ø8x60mm) using a 13mm wrench
The boiler frame allows pipe work to be installed behind the boiler.
Note that there are free spaces on the left and right of the expansion vessel. Do not guide pipe work
in front of the expansion vessel. The pipe work must be installed at least 10mm inside the front of the
frame.
ATAG i-Serie template and iC-Range boiler frame
Figure
8.1.a
= free space for piping
Summary of Contents for iC 24
Page 33: ...Installation Servicing instructions ATAG iC Range 33 Figure 10 7 a 10 9 Electrical diagram...
Page 56: ...Installation Servicing instructions ATAG iC Range 56 Annex C Short parts list...
Page 57: ...Installation Servicing instructions ATAG iC Range 57...
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......