20
Installation
Cascade floor standing in line
Floor standing rack assembly
1. Position the lower beam on the
ground in the required location.
2. Fit the lower brackets on the lower
beam using the supplied M8 bolts,
spring washers and nut.
3. Fit the vertical columns on the lower
bracket using the supplied M8 bolts,
spring washers and nut.
4. Fit the upper brackets on the
vertical pale using the supplied M8
bolts, spring washers and nut.
5. Fit the upper beam on the upper
brackets using the supplied M8
bolts, spring washers and nut.
Attention: once in the correct and
final position, the floor standing
rack has to be fixed on the ground.
Collector assembly
6. Place the flow water collectors in
the upper space.
7. Place the return water collectors
in the middle recess. Connect
the water lines using the supplied
DN100 gaskets, M16 bolts, spring
washers and nuts.
8. Place the gas collectors in the lower
recess. Connect the gas lines using
the supplied DN65 gaskets, M12
bolts, spring washers and nuts.
Boiler positioning
9. Move the boiler in front of the floor
standing rack. Once connected the
boiler with dedicated connection kit,
push the four brakes to block it.
1
3
4
5
6-7-8
9
2