Operation
21
Loading a Dispensing Cartridge
DV-7000
CAUTION!
Only trained service technicians should perform this procedure.
"
NOTE
This procedure is for a pump already mounted on the dispensing head.
1. Use the position controls to move the dispensing head to the front center of the dispensing area.
2. Perform a production shutdown as specified in the applicable dispensing system manual.
3. Open the dispensing system door or hatch, and locate the pump on the dispensing head.
4. Obtain the appropriate cartridge assembly for your application.
5. Push the cartridge into the valve body making sure to align the guide pin (Figure 4-3).
!
You will hear the cartridge release lever click as the cartridge snaps into place.
6. Install the fluid syringe, fittings, and feed tube as specified in “
Installing/Changing a Fluid
Syringe
” later in this section.
Figure 4-3 Cartridge Loading: DV-7000