17
l.
Restart and change “Boot Sequence” to “C, A” (boot from hard drive(C:)).
m.
If you can see the screen below, it means the data has been copied to hard drive successfully.
2. Visual Inspection should be implemented before Pretest.
3. Execute the Pretest Program
a.
Plug in the proper CPU voltage tools and check M/B power supply if it’s OK.
b.
If the M/B voltage is OK, plug in all the M/B test fixtures and equipments such as CPU,
Memory…etc.
c.
Power ON your test system and choose the “
HIMEM_CDROM”
option
d.
Choose the motherboard hot key to execute the proper program for the motherboard series you want
to test.
For example:
P2B,
Please key in”
PB
” to execute the P2B series pretest program.
Summary of Contents for RMA Pretest
Page 14: ...14 Send M B to Asus RMA Paste Diagnostic Card on PCI Solt 4 5 ...
Page 18: ...18 e Choose the proper model name to execute the pretest program For example Key in 1 for P2B ...
Page 19: ...19 Visual Inspection ...
Page 27: ...27 PCB Trace Scratched 1 PCB Trace Scratched 2 Consecutively three or more traces scratched ...
Page 28: ...28 PCB Oxidation 1 PCB Oxidation 2 If the PCB is oxidized by end user Ex Drinks coffee ...
Page 31: ...31 Test Tools Introduction ...
Page 40: ...40 CD ROM Test Tools Name M017 CD_ROM TX97 Part Number 15 093004001 ...