background image

Customer is required to provide adequate access the Product for any repair or 

inspection.  Aston Global shall not be liable for expenses or damage which may include 

but are limited to water damage, removal of any and all common building product such 

as tile, flooring, wood, sheet rock, plumbing fixtures,  concrete board, vanities, bathtubs 

and toilets or any other custom items. 

THIS WARRANTY GIVES YOU SPECIFIC LEGAL RIGHTS AND YOU MAY HAVE 

OTHER RIGHTS WHICH VARY FROM STATE TO STATE. ASTON GLOBAL'S 

FAILURE TO ENFORCE ANY TERMS OR CONDITIONS STATED HEREIN SHALL 

NOT BE CONSTRUED TO BE A WAIVER OF SUCH PROVISION. 

For prompt service, notify the original installer who, in turn, will notify the Aston Global 

distributor who supplied the Product.  If this does not result in prompt service, contact 

Aston Global,  Inc. at the address below with details in support of the warranty claim.  For 

any questions about coverage of this Warranty, contact Aston Global at the address 

below. 

Aston Global offers free phone support for the life of the Product to the original 

Owner. 

The Warranty applies only to Products manufactured on or after January 1, 2012. 

This Warranty may not be combined with any other warranty offered by Aston 

Global. 

21 

Summary of Contents for Orbitus SEN980

Page 1: ...ORBITUS SEN980...

Page 2: ...llation inspect installation surfaces or level and have to the strength to support the heavy weight of this shower door assembly This Shower Door should only be installed using the connection point to...

Page 3: ...Number Description 2 10 Door Threshold 1 11 Door Threahold End Cap 1 12 Door Seal 1 13 Door Seal 2 14 Door Seal 1 15 Door Handle 1 16 Screw Pack 1 4 17 Screw Pack 2 2 18 Screw Pack 3 QTY 1 2 1 1 1 1...

Page 4: ...SUPPLIED HARDWARE M4x40 I 3 SCREW PACK 1 Anchor 3 M4x40 SCREW PACK 11111111111111111i 2 2 Anchor 2 M4x40 81111111111111 IIIi 2 SCREW PACK 3 Anchor 2 SUPPLIED PARTS 3...

Page 5: ...ENTION This unit requires assembly A minimum of two people are required for assembly as several of the sections can be large and unstable until assembled You will need the following tools Caulk Tape M...

Page 6: ...door to open from left to right and cannot be reversed Note the location of the fixed glass panel and sliding door for the left handed shower installation Fixed glass Sliding Door 0 0 If your project...

Page 7: ...e next assembly steps Pre assembly the top rail onto the fixed glass to locate the mounting points on the wall relative to your desired location Painters tape or masking tape in the general location o...

Page 8: ...RAIL ATTACHED TO FIXED GLASS SHOULD BE POSITIONED TO INSIDE OF SHOWER Using a level verify the top rail 2 is horizontal and the fixed glass 3 is plumb See figure 4 1 Using a pencil mark the rail end 5...

Page 9: ...ion glass clamp 6 on shower base and attach to shower base using M4 x 40 screws from screw pack 1 The glass clamp should be positioned so the single hole is facing toward the inside of shower See figu...

Page 10: ...in place on both ends of top rail 2 not tightened position top rail fixed glass assembly so that rail end 5 mounting holes align with shower wall anchors Using M4X40 from screw pack 1 securely tighte...

Page 11: ...er should be 113 16 from edge of fixed glass See details in figure 4 NOTE If your surface is prone to cracking or chipping then it is recommended that you pilot drill first using a smaller drill bit a...

Page 12: ...upper roller assemblies 8 onto sliding door 4 as seen in figure1 Note The door handle mounting holes should be positioned to left The upper roller assemblies 9 will be on the outside of sliding door 4...

Page 13: ...of sliding door Locate the small hole in outside edge of roller assembly and insert a small hex wrench into hole opening Next using the hex wrench for roller assembly slightly loosen the roller wheel...

Page 14: ...ng with fixed glass 3 Mark the threshold end cap 11 mounting hole locations See figure 1 NOTE If your surface is prone to cracking or chipping then it is recommended that you pilot drill first using a...

Page 15: ...ealant to bottom of threshold bar assembly place into position See figure 3 4 Using the hardware from screw pack 3 install the threshold bar assembly Install the decorative screw plug covers into thre...

Page 16: ...Installing the door seals Install the door seals according to the drawing 15...

Page 17: ...Installing the door handle Install the door handle 15 using hardware provided Follow the assembly sequence seen in drawing 16...

Page 18: ...Final sealing Using Bath Kitchen silicone sealant seal the fixed glass 3 along bottom edge on shower base and side edge along shower wall Next seal around sliding door track divider 7 1 7...

Page 19: ...necessary to ensure the longevity of the unit Damage caused by not following the care and maintenance guidelines in this section is not covered under the manufacturer s warranty The glass doors and p...

Page 20: ...only Proof of purchase is required to exercise this Warranty Aston Global may at its option examine and inspect the alleged defective Product and Aston Global may request that parts be returned to Ast...

Page 21: ...nadoes or floods 8 Product used for any purpose other than residential bathroom usage LEGAL DISCLAIMERS ALL IMPLIED WARRANTIES INCLUDING WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURP...

Page 22: ...FORCE ANY TERMS OR CONDITIONS STATED HEREIN SHALL NOT BE CONSTRUED TO BE A WAIVER OF SUCH PROVISION For prompt service notify the original installer who in turn will notify the Aston Global distributo...

Page 23: ...ESCAPE THE EVERYDAY Customer Service 877 424 9699 If further assistance is required you have a question or need additional product information please visit our website www astonbath com...

Reviews: