background image

AQE-Series

Multi-port Power Over Ethernet Midspan Injector

Installation Manual

500-33600, Rev. A

Summary of Contents for Securitron AQE Series

Page 1: ...AQE Series Multi port Power Over Ethernet Midspan Injector Installation Manual 500 33600 Rev A ...

Page 2: ...2 Section 2 Initial Configuration 4 2 1 Preparing to configure the AQE 4 2 2 Logging into AQE Power Supply Control Center for the first time 4 2 3 Configuring the TCP IP Settings 5 2 4 Configuring the Administration Settings 6 2 5 Configuring the SNMP Settings 6 2 6 Configuring the Email Settings 7 2 7 The Programming Page 8 Section 3 Using the AQE 9 3 1 Viewing System Parameters on the AQE Home P...

Page 3: ...eration all wiring is ensured to be routed and secured to prevent accidental open or short circuit conditions iThe system and any batteries if used should be tested at least once per year to ensure proper operation Regulatory Information The equipment discussed within this manual has been tested to the following standards EN60950 EN55022 CLASS A EN55024 CSA C22 2 60950 FCC Information NOTE This eq...

Page 4: ...ption Notes AQE500R 16 port 32W per port 540W total Managed midspan injector Programmable port priority AQE250R 16 port 32W per port 270W total Managed midspan injector Programmable port priority The illustration below shows the model numbering convention of the AQE series using an example model number AQE indicates the model series The number 500 indicates a total of 500 Watts nominal output powe...

Page 5: ... location in the EIA rack 4 CENTER the enclosure in the rack and SECURE with the four provided 10 32 x 3 4 screws NOTE Rails or other appropriate support for heavy enclosures shall be used Heavier components shall be kept near the bottom of the rack to reduce the risk of toppling of a top heavy rack 1 1 Mounting the AQE Rack Mount Supply into a Standard 19 Rack The following pages cover the instal...

Page 6: ...External DC h No user serviceable parts inside refer servicing to qualified service personnel Aucune pièce interne ne peut être réparer Demandez l assistance d un technicien qualifié AC Power 8 7 6 Figure 2 AQE Front View Figure 3 AQE Rear View 500 33600 Rev A ...

Page 7: ...AQE Power Supply Control Center software LED Status Status Green Normal Operation Yellow Fault No Powered Device connected or fault condition present Off Port disabled When the AQE is first powered these LEDs will light yellow in sequence 1 16 six times as the unit performs a self test 6 AC Line Input AC Power This is the connector for the AC line cord PLUG the included computer style line cord in...

Page 8: ... begin flashing 2 2 Logging into AQE Power Supply Control Center for the first time From the factory the AQE is preset with the following settings IP Address 192 168 1 9 Username admin Password admin OPEN a browser on the computer and enter 192 168 1 9 into the address bar not in a search bar you may need to disable a search from the address bar setting in your browser if enabled A window will app...

Page 9: ...ET the final value to a number between 0 and 255 which is not being used by any other device on the subnet In the event the IP address is later forgotten PRESS the Reset button on the front panel of the AQE for 6 seconds and the IP address default user name and default password will be reset to factory default values Net Mask Should typically be set to 255 255 255 0 MAC address The MAC Address is ...

Page 10: ... fields must match in order to successfully change the password CLICK the Submit button apopupmessagewillconfirmasuccessful password change When you leave the configure page the AQE will ask you to re log in Insert Date ENTER the correct date in the specified value field It should be noted that the format is YYYY MM DD For example for February you should enter 02 not 2 Insert Time ENTER the correc...

Page 11: ...may be entered Under Sender the settings of the account to send the emails should be entered These settings include CLICK the Submit button to save the settings which will take effect after rebooting the AQE Sender SMTP Server This is the address of the SMTP server for the email provider Consult with your email provider for this address Sender s Email This is the email address which the AQE will u...

Page 12: ...n the HOME page NOTE The email settings must be configured properly See Section 2 6 of this manual To enable upper and lower limit checking CHECK the box next to Voltage Current Limit Setting at the top of the screen CHECK the E Mail Alert box for any port to be monitored and ENTER the lower and upper limits for that port CLICK the Save button to save the settings NOTE The upper and lower limits e...

Page 13: ...Configure page The date and time can be adjusted by time zone and is battery backed up via an internal battery Auto refresh CLICK the Enable button to turn on auto refresh for the home page Auto Refresh automatically reloads the page every five seconds to update the data shown CLICK the button again to disable Auto Refresh Below the general information area is the port information and control area...

Page 14: ...ore information Voltage This column displays the measured PoE port output voltage for each port in volts Current This column displays the measured PoE port output current for each port in milliamps Power This column displays the power output of each PoE port in watts Class This column displays the power class of each port The power class information is provided by the connected Powered Device such...

Page 15: ...e AQE VERIFY the correct file name and CLICK the Confirm button to confirm the upgrade Next CLICK the Burn button to begin burning the firmware to the AQE s processor This process may take up to 12 minutes DO NOT REMOVE POWER TO THE AQE DURING THIS PROCESS or the AQE will be rendered nonfunctional Once the update is complete a message will appear in the message box indicating Update Finished The A...

Page 16: ...ion Recipient may also make one 1 additional copy for backup or archival purposes at one 1 Recipient facility which may be a different Recipient facility from where the other Software copy is installed and used Recipient may also Upgrade the Software subject to Upgrades that may be provided from time to time by HANCHETT ENTRY SYSTEMS INC at its sole discretion The Software subsequent to any Upgrad...

Page 17: ...FACTORY QUALITY MERCHANTABILITY OR FITNESS FOR ANY PARTICULAR PURPOSE WITH RESPECT TO THIRD PARTY INFORMATION i Notices Recipient shall not remove or alter any copyright trademark or other proprietary notice that appears on or in the Software j Software License Compliance Audit HANCHETT ENTRY SYSTEMS INC may audit Recipient s use of the Software on thirty 30 days advanced written notice Recipient ...

Page 18: ...e of the Software in combination with hardware or software or Third Party Information not provided by HANCHETT ENTRY SYSTEMS INC A that is specifically forbidden by the Documentation or B that is not designated in the Documentation as available for interface with the Software 6 Term and Termination a Term This AGREEMENT shall remain in effect so long as the Recipient continues to use and or mainta...

Page 19: ...ation and Construction The parties agree that the terms of this AGREEMENT result from negotiations between them This AGREEMENT will not be construed in favor of or against either party by reason of authorship j Entire Agreement This AGREEMENT sets forth the entire AGREEMENT of the parties and supersedes all prior or contemporaneous writings negotiations and discussions with respect to the subject ...

Page 20: ...16 securitron com Securitron 10027 South 51st Street Suite 102 Phoneix AZ 85044 Phone 623 582 4626 Fax 623 582 4641 2014 Hanchett Entry Systems Inc an ASSA ABLOY Group Company 500 33600 Rev A ...

Reviews: