Copyright © 1986, 2014 Yale Security Inc., an ASSA ABLOY Group company. All rights reserved.
Reproduction in whole or in part without the express written permission of Yale Security Inc. is prohibited.
80-9349-0010-020 (07-14)
ASSA ABLOY
3
Installation Sequence
1. Using the template at the top of page 2, see
figure 2, select the angle of opening desired.
Locate and mark for 4 holes on the door for the
closer body and 2 holes on the frame for the
arm shoe.
2. Prepare the door and frame for fasteners using
the information from the "Preparation for
Fasteners" chart, figure 3 on page 2.
3. Install closer body to door as shown.
6. Following the main arm indexing illustrations in
figure 4, place main arm onto the closer pinion
shaft. Install and tighten main arm screw with a
1/2" wrench.
4. Disassemble holder loop assembly from the
main arm assembly by loosening set screw.
5. Fasten holder loop assembly to frame face as
shown.
NOTE: Holder Adjustment Nut must be UP for
Right Hand Door
DOWN for Left Hand Door
Holder
Adjustment
Nut
7. Open door slightly and assemble connecting
rod into holder loop. Close and latch door.
Adjust secondary arm assembly so that the
main arm is perpendicular to face of door.
Tighten set screw securely.
8.
Hold Open Adjustment -
Open door to angle of hold open desired and
tighten holder adjustment nut with wrench
supplied.
9. Closing Tension - Place wrench (packed with door closer) on ratchet as shown. Swing wrench away from
hinge to wind spring between 3 to 10 notches, engage arm dog in ratchet, increase or decrease spring
power to suit conditions.
Caution - Underwound
spring (less than 3 notches)
or overwound spring (more
than 10 notches) will cause
spring breakage.
Left Hand Door
Right Hand Door
Dog
Dog