7
ED3400/ED3400A Series
Installation Instructions
Surface Vertical Rod
FM361 04/20
Copyright © 2020 ASSA ABLOY Access and Egress Hardware Group, Inc. All rights reserved. Reproduction in whole or in
part without the express written permission of ASSA ABLOY Access and Egress Hardware Group, Inc. is prohibited.
For installation assistance contact Corbin Russwin
1-800-543-3658 • [email protected]
f
Top Latch and Rod
1. Remove cover.
2. Screw top rod into top latch chassis
halfway. (Figure 15)
3. Confirm crossbar arm is NOT in
dogged position.
4. Remove top rod pin from active
chassis and slide top rod into
active chassis. (Figure 16)
5. Attach top latch chassis to door
with screws according
to template.
Note
Use through-bolt screws for fire rated doors.
6. Ensure top latch bolt is fully extended.
7. Rotate rod until upper hole (see detail)
aligns with hole in active chassis and
insert rod adjustment pin.
g
Mount Bottom Rod Assembly
1. Remove cover.
2. Position bottom case on door,
centered on vertical center line.
Raise or lower to achieve gap
indicated for strike application.
3. Mark and center punch mounting holes for bottom latch.
4. Drill and tap mounting holes.
5. Screw bottom rod into bottom latch chassis until finger tight.
Figure 15
Figure 16
Active Chassis
Top rod
Top latch cover
Top latch chassis
Rod adjustment pin
Wood: #10 x 1-1/4"
Phillips flat head
(Total = 4)
Outside trim mounting screws - Actual size
Figure 17
Metal: #10-24 x 3/4"
Phillips Flat under
cut (Total = 4)
Cylinder mounting screws - Actual size
Mortise applied strikes
Surface applied strike
Latch track thresholds
(by others)
1/4"
1/8"
1/8"
Figure 18