Page | 3
P
800.872.3267
F
800.232.7329
E
www.adamsrite.com
Prepping the Frame (LHR Shown)
1. DETERMINE and MARK the applicable bar height centerline (horizontal line) of the exit device on the
frame for the strike plate.
2. DETERMINE the location of the strike plate template by using the bar height centerline of the exit
device and aligning the template with the surface of the closed door.
3. MARK, CENTER PUNCH, DRILL all holes.
4. REMOVE the template.
1-17/32” from
inside surface
of closed door
Cut away
stop
Bar Height Centerline
1-1/2”
3”
1”
2”
Drill 5/32”dia pilot
holes for self-tapping
screws, 2 places