27
107750-01 - 9/17
VII. Venting
B. Design Requirements Unique to Horizontal Twin Pipe Venting Systems (continued)
Note:
Air intake termination not shown, refer to
Venting Section in Installation Instructions
supplied with the boiler
.
Figure 7.1
1: Location of V
ent T
erminal Relative to W
indows, Doors, Grades, Overhangs, Meters and Forced
Air Inlets - T
wo-Pipe System V
ent
Terminal (Shown) T
wo-Pipe System
Air Intake T
erminal (Not Shown)
Summary of Contents for ASPN-320
Page 88: ...88 107750 01 9 17 Figure 10 4 Proper Installation of Header Sensor X Wiring continued ...
Page 89: ...89 107750 01 9 17 Figure 10 5 Internal Wiring Ladder Diagram X Wiring continued ...
Page 90: ...90 107750 01 9 17 X Wiring continued CONDENSATE FLOAT SWITCH ...
Page 91: ...91 107750 01 9 17 X Wiring continued Figure 10 6 Internal Wiring Connections Diagram ...
Page 100: ...100 107750 01 9 17 Operating Instructions XI Start Up and Checkout continued ...
Page 145: ...145 107750 01 9 17 XV Service Parts continued ...
Page 147: ...147 107750 01 9 17 XV Service Parts continued All Models ...
Page 149: ...149 107750 01 9 17 XV Service Parts continued All Models ...
Page 151: ...151 107750 01 9 17 XV Service Parts continued All models ...
Page 157: ...157 107750 01 9 17 ...
Page 158: ...158 107750 01 9 17 ...
Page 159: ...159 107750 01 9 17 ...