Aspen 1900-OA Installation Instructions Manual Download Page 4

4

Installation Instructions – ASPEN 1900 Series Mid-Sized Bollard

ADL141353     www.eaton.com

Figure 3.   

Step 2: Anchor Bolt Installation

1.  Disconnect or turn fixture power OFF prior to 

performing all installation and maintenance activities. 

Trench as appropriate and place conduit as required 

by the National Electric Code and any other applicable 

rules, regulations, and requirements. Ensure that 

there is enough depth in trench to accept anchor bolt 

assembly. 

2.  Remove the external sleeve from the fixture base. 

Locate anchor bolt assembly.

3.  Place anchor bolt assembly (three anchor bolts 

attached to pad plate with nuts) over conduit and 

secure for concrete pour. Make sure that the pad 

plate is flush with the concrete surface, and that the 

assembly will not be dislodged during concrete pour 

operations. (Figure 3.)  The base has been designed 

to accept two (2) conduits for daisy chaining when 

necessary.

ote:

N

Ensure that there is enough thread length above 

the pad plate to accept the fixture base and 

neoprene pad, and to allow 2” to protrude from the 

top of the base. (Figure 4.)

4.  Pour concrete. Make sure that pad plate is as level as 

possible. Allow concrete to cure.

2”

Conduit

Figure 4.   

Pad Plate on surface 

of concrete

Figure 5.   

1.  To level the base, adjust the top three lock nuts. 
2.  As you tighten the nuts, the base compresses the 

underlying neoprene pad for quick and easy leveling.

Step 4: Leveling Base

1.  Pull line-voltage wire leads through the conduit and 

fixture base and make connection to component 

frame assembly input leads (LED module shown) 

(Figure 6.) Connect supply wires to appropriate 

luminaire leads. 

• 

Supply side ground wire to green luminaire lead.

• 

Supply side neutral wire to white luminaire lead. 

• 

Supply side line voltage 

wire to black luminaire lead.

2.  Secure the external sleeve 

to the base by tighten 

the three (3) counter-

sink screws. (Figure 7.) 

Recommend tightening 

by hand as to not strip the 

screw

Step 5: Connecting to Power

1.  Remove the top three nuts from the anchor bolts. 

(Figure 5.)

2.  Place the base mounting pad and base onto the bolts.
3.  Replace the top three nuts with the supplied lock nuts 

to ensure that the base remains secure to the anchor 

bolts.

Step 3: Base Installation

Base

Base Mounting Pad

Figure 6.   

Summary of Contents for 1900-OA

Page 1: ...INS Brand Logo reversed out of black INS ADL141353 Installation Instructions ASPEN 1900 Series Mid Sized Bollard 1900 OA 1900 IL ...

Page 2: ... to edges of sheet metal or any sharp objects Proper grounding is required to ensure personal safety NOTE Specifications and dimensions subject to change without notice NOTE Replace removable parts after servicing IMPORTANT Read carefully before installing fixture Retain for future reference GENERAL Upon receipt of the fixture thoroughly inspect for any freight damage which should be brought to th...

Page 3: ...900 OA Series Mid Sized Bollards INSTALLATION Installation Instructions ASPEN 1900 Series Mid Sized Bollard ADL141353 www eaton com Mid Size Bollard External Sleeve with factory sealed optical assembly Component Frame Assembly Options Base Mounting Pad Anchor Bolt Assembly with Bolt Plate LED MR16 PAR20 Figure 2 ASPEN 1900 IL Series Mid Sized Bollards Mid Size Bollard External Sleeve with factory ...

Page 4: ...nd to allow 2 to protrude from the top of the base Figure 4 4 Pour concrete Make sure that pad plate is as level as possible Allow concrete to cure 2 Conduit Figure 4 Pad Plate on surface of concrete Figure 5 1 To level the base adjust the top three lock nuts 2 As you tighten the nuts the base compresses the underlying neoprene pad for quick and easy leveling Step 4 Leveling Base 1 Pull line volta...

Page 5: ...le Section Figure 9 7 Cat 1900 IL Compact Fluorescent Lamp Align pins with socket Place the lamp in the socket and turn clockwise to snap lamp into place This fixture accepts either 26W 32W or 42W compact flourescent lamps 8 Place external sleeve over component frame assembly and secure to base using the three counter sink screws Step 6 Relamping Remove external sleeve to access lamp or LED Figure...

Page 6: ...er Lighting Business 18001 East Colfax Avenue Aurora CO 80011 Cooperlighting com 2014 Eaton All Rights Reserved Printed in USA Imprimé aux États Unis Impreso en los EE UU Publication No ADL141353 Rev Date December 2014 Warranties and Limitation of Liability Please refer to www cooperlighting com WarrantyTerms for our terms and conditions Garanties et limitation de responsabilité Veuillez consulter...

Reviews: