VDSL CPE CONVERTER USER’S MANUAL
VER. A.5
5
2.
Installing the Converter
Hardware Installation
This chapter describes how to install the converter and establishes
network connections. You may install the converter on any level
surface (e.q, a table or shelf). However, please take note of the
following minimum site requirements before you begin. Stick the 4
plastic feet at the bottom.
Pre-installation Requirements
Before you start actual hardware installation, make sure you can
provide the right operating environment, including power requirements,
sufficient physical space, and proximity to other network devices that
are to be connected. Verify the following installation requirement:
Power requirements: DC5V/1A or above.
The converter should be located in a cool dry place, with at least
10cm/4in of space at the front and back for ventilation.
Place the Converter out of direct sunlight, and away from heat
sources or areas with a high amount of electromagnetic interference.
Check if network cables and connectors needed for installation are
available