background image

4

5

6A

6B

USING THE X-RAY STAND 

- Cont’d

4. Ref. Figure 6A:

Push the X-Ray clamp

locking lever (K) down to open the X-Ray
clamp (H). 

5. Ref. Figures 6B, 6C, and 6D:

Carefully

place the X-Ray unit between the X-Ray
clamp jaws. Pull the locking lever up to
close and lock the clamp onto the unit. 

IMPORTANT:

Ensure that the X-Ray

Adapter is installed on the X-Ray unit handle
before clamping the unit into the stand.

6. Ref. Figure 6B:

If there is too much, or

too little, tension on the X-Ray clamp jaws
to close firmly around the X-Ray unit
handle, turn the clamp adjustment knob (L)
clockwise to increase jaw tension or
counterclockwise to loosen jaw tension. 

7.

To fold up the ARU-01BS X-Ray Stand,
loosen the upper tube locking lever (G)
and slide the upper tube (B) down into the
bottom tube. Firmly close the locking lever.
Unscrew the clamp knob (I) to sufficiently
loosen and pull the X-Ray clamp (H)
assembly away from the square bracket.
Fold the assembly against the stand and
retighten the clamp knob. Open the bottom
tube locking lever (D), fold the base legs
against the bottom tube (A), and firmly
close the locking lever.

6C

6D

H

K

L

H

I

J

K

H

L

H

L

K

Summary of Contents for ARU-01BS

Page 1: ...ARU 01BS X RAY STAND SETUP and ASSEMBLY INSTRUCTION MANUAL ...

Page 2: ... Package Contents 1 Parts List Assembly 2 Installing the X Ray Adapter 3 Using the X Ray Stand 3 Notes 5 Warranty Back Cover P O Box 1548 Woodinville WA 98072 425 487 3157 800 426 5913 www aseptico com info aseptico com ...

Page 3: ...ratulations This system is engineered to provide many years of reliable service Please read the instructions provided in this manual to receive the best and longest service from your Aseptico equipment Separate manuals may be provided to cover the operation and maintenance of the X Ray Unit or other accessories for your unit PACKAGE CONTENTS ARU 01BS X Ray Stand 461361 X Ray Mounting Adapter Soft ...

Page 4: ... stand collapse Ref Figure 2C 3 Ref Figures 3A 3B Unscrew the clamp knob I sufficiently to loosen X Ray clamp assembly H Raise the X Ray clamp H and push assembly in toward the stand A B C D E F G H J L K M I PARTS LIST ASSEMBLY Part Ref Part Description A Bottom Tube B Upper Tube C Bottom Tube Collar D Bottom Locking Lever E Base F Upper Tube Collar G Upper Locking Lever H X Ray Clamp I Clamp Kno...

Page 5: ...tube B to the appropriate height for the x ray procedure Firmly close the locking lever Height Adjusts from 36 in min to 60 in max Note To make height adjustments easier we recommend that adjustments be made without an X Ray unit mounted in the stand 3 Ref Figure 5 The X Ray clamp H can be rotated to allow precise positioning of the X Ray unit Unscrew the clamp knob I slightly to loosen clamp asse...

Page 6: ...the X Ray clamp jaws to close firmly around the X Ray unit handle turn the clamp adjustment knob L clockwise to increase jaw tension or counterclockwise to loosen jaw tension 7 To fold up the ARU 01BS X Ray Stand loosen the upper tube locking lever G and slide the upper tube B down into the bottom tube Firmly close the locking lever Unscrew the clamp knob I to sufficiently loosen and pull the X Ra...

Page 7: ...5 NOTES ...

Page 8: ...t to Aseptico and the cost thereof is always the responsibility of the purchaser Accidental misuse inappropriate installation or failure to perform directed maintenance voids the warranty Aseptico does not assume under this warranty any risks or liabilities arising from the clinical use of its products whether or not such use involves coincidental utilization of products manufactured by others NOT...

Reviews: