![ASEA AC25Q-1 Operation Manual Download Page 45](http://html1.mh-extra.com/html/asea/ac25q-1/ac25q-1_operation-manual_2981673045.webp)
AC25/30Q-1 and -3 Operations Manual....
45
7.3
LOAD MANAGEMENT OPERATION, cont.
7.3.5 Quick Setup of Shore Cord Alarm
, Single, Master, or Slave Converters
1. Turn on the red Disconnect switch of both converters and wait 15-20 seconds for initialization.
2. Press the
SHORE POWER
+
F2
buttons on both converters.
3. Press the Cursor (
F4
) button to advance to the ALARM AT % setting.
4. Set the converter ALARM AT % using the More/Less (
F1
/
F2
) buttons.
5. Press the Cursor (
F4
) button to advance to the ALARM enable setting.
6. Set the converter ALARM enable using the Enable/Disable (
F1
/
F2
) buttons.
7. Press the Exit (
F5
) button to save the settings and exit.
8. Turn on the converters and place online as usual. Alarm will occur when loading reaches the
ALARM AT % setting.