![ASEA AC25Q-1 Operation Manual Download Page 26](http://html1.mh-extra.com/html/asea/ac25q-1/ac25q-1_operation-manual_2981673026.webp)
AC25/30Q-1 and -3 Operations Manual....
26
6 OPERATION
6.1
POWER TURN-ON PROCEDURE
Close the shore power (input) circuit breaker or switch to the converter. Turn the disconnect
(14)
switch to the ON position. After 1-3 seconds, fans will be heard, and the display will
become active. Allow the converter to initialize (the display LOAD LEVEL field will change
from 0.0 % to a small reading after initialization) before attempting to operate it.
FIGURE 6 FRONT PANEL CONTROLS