Setup Instructions
Low-Rise Jobs
Lifting the frame onto to roof:
1.
Position the frame and Power Unit close to the location where they are going to be raised to the roof top.
2.
You need at least three men, on the ground to tie and guide parts and two on the roof top to pull parts up.
3.
The frame parts must be placed at least 10ft from the roof edge for assembly.
Raising the Power Unit (Using Hand Winch)
1.
Install the Hand Winch in place of the Hydraulic Winch on the hoist frame. Always ensure that sufficient
ballast is installed on the hoist frame before lifting the Power Unit.
2.
Unwind enough cable to go under the Guide Pulley on the Vertical Boom and over the Swing Pulley.
3.
Slide the frame to the edge of the roof.
4.
Lower the cable to ground level and attach the Power Pack or Winch to the end of the hoist cable.
NOTE: Make sure that there are at least 400lbs of counterweights installed on the hoist counterweight base before
listing the Power Unit.
5.
Hoist up Power Pack or Winch using the Hand Winch.
6.
To swing the load in, remove Pin #15 from the swing cylinder and swing the boom in manually.
High-Rise Jobs
The frame of the ASE Swing Hoist can be disassembled to fit into elevators for quick and safe transportation to the
roof deck.
Frame Assembly
1.
Attach the two parts of the Rear Frame (#3) together using the bolts and welded nuts provided.
2.
Attach the two parts of the Vertical Frame (#4) together using the bolts and welded nuts provided.
3.
Lay the Vertical Frame (#4) down to the deck. Insert the two axles of the Swing Boom (#2) into the tubes
(#13) on the Vertical Frame.
4.
Lift the Vertical Frame and Swing Boom into an upright position. While two men hold this frame upright,
another will attach the Rear Frame (#3) to bracket on the top tube (#13) and insert pin (#21) and lock pin
(#16).
5.
Install the bottom telescopic tubes (#6 + #7) into the brackets at the bottom of the vertical boom (#2) and
insert pins (#8 + #9). Also insert locking pins into (#16).
6.
Place the Hydraulic Swing Cylinder Arm (#5) on the bottom Swing Tube Bracket and insert pins (#10 + #11)
and lock pin (#16). Slide Tube may be adjusted by sliding up or on rear leg (#3).
7.
Place the Swing Cylinder (#18) on arm (#5) and insert pin (#17 + #16). The hydraulic cylinder shaft rod end is
inserted into the Swing Boom (#2). Bracket and pins are inserted to keep it in place.
8.
Install the Safety Fence (#25) on the Vertical Frame.
Summary of Contents for 2000
Page 1: ...2170 Winston Park Drive Oakville Ontario L6H 5W1 Owner s Manual 2000 Hydraulic Swing Hoist ...
Page 17: ...All Seasons Equipment Owner s Manual 2000 Hydraulic Swing Hoist 17 Parts Drawings Certificate ...
Page 18: ...All Seasons Equipment Owner s Manual 2000 Hydraulic Swing Hoist 18 ...
Page 19: ...All Seasons Equipment Owner s Manual 2000 Hydraulic Swing Hoist 19 ...
Page 20: ...All Seasons Equipment Owner s Manual 2000 Hydraulic Swing Hoist 20 ...
Page 21: ...All Seasons Equipment Owner s Manual 2000 Hydraulic Swing Hoist 21 ...
Page 22: ...All Seasons Equipment Owner s Manual 2000 Hydraulic Swing Hoist 22 ...
Page 23: ...All Seasons Equipment Owner s Manual 2000 Hydraulic Swing Hoist 23 ...
Page 24: ...All Seasons Equipment Owner s Manual 2000 Hydraulic Swing Hoist 24 ...
Page 26: ...All Seasons Equipment Owner s Manual 2000 Hydraulic Swing Hoist 26 Stickers Decals ...