The switch can be installed on the desk or the cabinet. The location of the machine box, 
cabinet planning and indoor cabling are very important for normal system’s function. Short 
distance between devices, bad ventilation and untouchable control plate will cause 
maintenance problems, systematic faulty and breakdown. 

 

For location planning and device locating, refer to section 2.3.2 “Location Configuration 
Prevention”.

 

 

The following preventive measures assist you to design the proper environment for the 
switch. 

 

 

Make sure that the workshop is well-ventilated, the heat of electrical devices is well-discharged 
and sufficient air circulation is provided for device cooling. 

 

 

Avoid to damage devices by following the electrostatic discharge prevention procedure.

 

 

Put the machine box at the place where cool air can blow off the heat inside the machine box. 
Make sure the machine box is sealed because the opened machine box will reverse the cool air 
flow.

 

 

The following content assists you to make a proper cabinet configuration: 

 

 

Each device on the cabinet gives off heat when it runs. Therefore, the sealed cabinet must have 
the heat-discharge outlet and the cooling fan. Do not put the devices too close, avoiding bad 
ventilation. 

 

 

When you install the machine box at the open cabinet, prevent the frame of the cabinet from 
blocking the airway of the machine box. 

 

 

Ensure that nice ventilation is provided for the devices installed at the bottom of the cabinet.

 

 

The clapboard separates exhaust gas and inflow air, and boost cool air to flow in the machine 
box. The best location of the clapboard is decided by the air flow mode in the machine box, 
which can be obtained through different location tests.

 

 

Make sure that the power supply has nice grounding and the power at the input side of the 
switch is reliable. The voltage control can be installed if necessary. At least a 240 V, 10A fuse 
or a breaker is provided in the phase line if you prepare the short-circuit prevention measures 
for a building. 

 

 

Warning

 

If the power supply system does not have good grounding, or the input power disturbs too much 
and excessive pulses exist, the error code rate of communication devices increases and even the 
hardware system will be damaged. 

Summary of Contents for AS3424S

Page 1: ...ACT AS3424S 24 x 10GE Layer 3 Switch Installation Guide Revision B...

Page 2: ...duction in any manner whatsoever without the express written permission of Ascent Communication Technology is strictly forbidden This document is produced to assist professional and properly trained p...

Page 3: ...2 Installation Preparation 7 2 1 Caution of Usage 7 2 2 Safety Advice 7 2 3 Requirements for Common Locations 8 2 4 Installation Tools and Device 10 3 Installing the ASCENT AS3424S Switch 11 3 1 Insta...

Page 4: ...ont template of the ASCENT AS3424S switch Table 1 2 Parts at the front template of the ASCENT AS3424S switch No Abbrev Name Description 1 Power LED indicator Power indicator refer to indicator descrip...

Page 5: ...802 3x Flow control IEEE 802 3z asymmetric flow control IEEE 802 3ad Link aggregation IP Routing Protocol Standard RFC 1058 RIP RFC 1723 RIP v2 RFC 1583 OSPF v2 Network Management Standard RFC 1157 SN...

Page 6: ...AS3424S Hardware Installation Guide Solutions Provider for FTTx RFoG and HFC www ascentcomtec com Page 6 of 22 Output current 5A MAX Full Power Consumption 75W...

Page 7: ...to national laws and regulations or send these products to our company for collective processing Keep dustless and clean during or after the installation Put the cover at the safe place Put tools at t...

Page 8: ...ch and plug off the power line before installing or uninstalling the machine box or working beside the power 4 Do not work alone if potential dangers exist 5 Cut off the power before checkout 6 If tro...

Page 9: ...following content assists you to make a proper cabinet configuration Each device on the cabinet gives off heat when it runs Therefore the sealed cabinet must have the heat discharge outlet and the coo...

Page 10: ...devices to install the ASCENT AS3424S switch are not provided by the ASCENT AS3424S switch You yourself need to prepare them The following are the tools and devices needed for the typical installation...

Page 11: ...nals are allowed to install or replace the devices The installation of the machine box has two modes Installing the machine box on the desk Installing the machine box on the cabinet The ASCENT AS3424S...

Page 12: ...See Figure 3 2 Figure 3 4 Installing the switch on the cabinet The switch of ASCENT AS3424S has a console port The rate of the console port is a value ranging from 1200bps to 115200bps It has a standa...

Page 13: ...th the value from 1 to 8 Figure 3 4 Connecting the console port of ASCENT AS3424S and computer Warning The switch shown in figure 3 4 does not represent the material ASCENT AS3424S Table 3 1 Pins of t...

Page 14: ...8 Figure 3 5 RJ 45 connector on the console port Because the 10 100 1000Base T ports of ASCENT AS3424S support the MDI MDIX self identification of the cable ASCENT AS3424S can adopt five types of dir...

Page 15: ...e SFP optical module to the SFP port and then you can connect other Ethernet terminal devices through the optical cable Figure 3 7 Connecting the 10GE SFP port and other Ethernet terminals Warning The...

Page 16: ...vides with 1 USB2 0 interface Before electrically starting up the switch perform the following checkups after the switch is installed If the switch is installed on the cabinet check whether the instal...

Page 17: ...he switch required tools and operation methods Warning When the power cable still connects the power source do not touch it When you open the cover the switch you may use the following tools Crossed s...

Page 18: ...the machine box is hard to install The section mainly describes how to put the cover and close the machine box Do as follows 5 Put them well according to their locations and joint them together along...

Page 19: ...ion 2 3 Requirements for Common Locations If the switch cannot be started and the PWR indicator is off check the power Do the following checkups to help remove the fault If the port of the switch cann...

Page 20: ...ly linked If the indicator is off the port is not linked If the indicator flickers there is data transmission 2 The 40GE port breaks out into 4 10GE ports The 4 port indicators are on in turn The inte...

Page 21: ...AS3424S Hardware Installation Guide Solutions Provider for FTTx RFoG and HFC www ascentcomtec com Page 21 of 22 Figure 5 3 QSFP port indicator...

Page 22: ...nit 1907 600 Luban Road 2710 Thomes Ave 200023 Shanghai CHINA Cheyenne WY 82001 USA Phone 86 21 60232616 Phone 1 203 816 5188 EUROPE VIETNAM Pfarrer Bensheimer Strasse 7a 15 F TTC Building Duy Tan Str...

Reviews: