background image

 

 

3

asberprofessional.com

 

 

 

 

 

 

 

 

 

 

 

 

 

asberprofessional.com

 

2.3 

Installation and assembly 

SHIPPING DAMAGE CLAIM PROCEDURE 

The  equipment  is  inspected  and  crated  by  skilled  personnel  before  leaving  our  factory.  The 
transportation company assumes full responsibility for safe delivery upon acceptance of this equipment. 
If shipment arrives damaged: 

Visible loss or  damage:

 Note on freight bill or express delivery and signed by person making 

delivery. 

File claim for damages immediately

: Regardless of extent of damages. 

Concealed  loss  or  damage:

  If  damage  is  noticed  after  unpacking,  notify  transportation 

company immediately and file 

“Concealed Damage“ claim with them. This should be done within 

(15) days from date of delivery made to you. Retain container for inspection. 
 

2.3.1

 

UNCRATING 

Cut and remove the outer packaging. Cut the (4) clamps that hold the equipment to the skid lift the unit 
off the skid. 

2.3.2

 

INSTALLATION OF LEGS 

LEGS ASSEMBLY: 

·

 

Mount Legs on  bottom of product, the appliance may be further leveled with  adjustment in 
the foot of the leg

 

 

 

 

Summary of Contents for AEF-2525 S

Page 1: ...5 NG Manual instructions Installation and Operation Manueltalimatlar Kurulum ve al t rma Manual de instrucciones Uso y mantenimiento Manuel d instructions Installation et fonctionnement Bedienungshinw...

Page 2: ...ion and assembly 3 2 3 1 UNCRATING 3 2 3 2 INSTALLATION OF LEGS 3 2 4 Gas Connections 5 2 4 1 MANUAL SHUT OFF VALVE 5 2 4 2 PRESSURE REGULATOR 5 2 4 3 THIS APPLIANCE IS EQUIPPED FOR NATURAL GAS GAS 5...

Page 3: ...t is design engineered for commercial use only 1 2 IMPORTANT SAFETY INFORMATION WARNING Improper installation adjustment alteration service or maintenance can cause property damage injury or death Rea...

Page 4: ...aled damage to the equipment notify the carrier immediately Notification should be made verbally as well as in written form Request an inspection by the shipping company of the damaged equipment Retai...

Page 5: ...n making delivery File claim for damages immediately Regardless of extent of damages Concealed loss or damage If damage is noticed after unpacking notify transportation company immediately and file Co...

Page 6: ...twist caster shaft in the biggest hole Inside there is a welded nut to hold caster shaft STEP 4 Repeat step 3 for each caster and verify the base of caster abuts the base frame Important you will hav...

Page 7: ...oming service line for safe and efficient operation the gas pressure regulator supplied by ASBER must be installed at the gas inlet of each piece of equipment The regulators supplied along with ASBER...

Page 8: ...ocal installation codes Before Installation please read instructions completely and carefully Do not remove permanently affixed labels warnings or plates from the product Please observe all local and...

Page 9: ...p dial depressed for about 30 seconds or until pilot stays lit before releasing 6 If the pilot does not stay lit repeat step 4 and 5 7 Turn gas tap dial on the combination gas valve to on position 8 T...

Page 10: ...ight the pilot and turn on the burners 5 When the solution starts to boil turn off the thermostat and let the vessel soak to soften the deposit and or carbon spots Approximately 1 hour 6 Drain off sol...

Page 11: ...thermopile c Turn and set gas tap dial to ON position d Set thermostat to desired temperature e Replace f Replace Fryer does not heat up fast a Insufficient gas b Line clogged c Overloading the fryer...

Page 12: ...y Normal parts wear and maintenance is also not covered by this warranty This warranty is in lieu of any other agreement expressed or implied and constitutes the only warranty of ASBER with respect to...

Page 13: ...sberprofessional com ASBER Circuito Exportaci n N 201 Parque Industrial Tres Naciones San Lu s Potos S L P M xico 13105 NW 47th Ave Miami Fl 33054 www asberprofessional com MULTI SOLUTION MANUFACTURER...

Reviews: