background image

 3 of 6 

SET-UP 

SET-UP (cont’d.) 

4.  Install the adjustable length E-track cam-buckle 

strap in the desired E-track slot location.  Route the 

strap around the front of the cooler as shown in fig. 

4. 

Note: If you have chosen to use one of the alternate E-track 

slots, route the strap accordingly. 

 

5.  Install the adjustable end of strap into the fixed 

end’s cam buckle and tighten strap down. Once 

fully tightened, cut the excess strap (if desired) 

using a pair of scissors.   

 

 

Remove the beverage cooler from the beverage 

cooler holder prior to the next step.  

6.  Once the strap is cut to length, use a heat gun or 

lighter to singe the cut end of the strap to make 

sure that the strap does not fray. See fig. 6. 

Note: One E-track cam-buckle strap is provided in the 

kit. However, the mount was designed with many E-

track and bungee cord slots to allow the user the option 

to add more straps or bungee cords, as desired.  

 

Fig. 4 

(install adjustable length hold-down strap end)

 

Fig. 6 

(cut adjustable length hold-down strap end)

 

Cut and singe 

Hold-down strap 

CAUTION: 

Reviews: