ARTEX PRODUCTS / ACR ELECTRONICS, INC
DESCRIPTION, OPERATION, INSTALLATION AND MAINTENANCE MANUAL
C406-2 (453-5000), C406-2HM (453-5001)
570-5000 Rev. U
Company Confidential
25-62-11
Page 55 of 66
SUBTASK 25-62-11-410-002
C.
Installation Documentation
1)
Make appropriate logbook (i.e., aircraft records) entries and submit FAA Form 337, along with any
supporting data required by the FAA for approval of the installation, as applicable.
NOTE:
Refer to TASK 25-62-11-410-801 on page 39 for additional information on installation
approvals.
2)
In countries other than the United States, make appropriate aircraft records entries and submit
documentation as required for installation approval in accordance with national regulatory authorities.
TASK 25-62-11-450-806
8.
Battery Pack Installation
SUBTASK 25-62-11-450-001
A.
Battery Reinstallation
CAUTION:
THE BATTERY PACK CONTAINS ELECTROSTATIC DISCHARGE SENSITIVE (ESD)
COMPONENTS AND IT MUST BE HANDLED WITH CARE. IF POSSIBLE, WEAR A
GROUNDED WRIST STRAP WHEN HANDLING THE BATTERY PACK DURING
INSTALLATION ACTIVITIES. TAKE PARTICULAR CARE TO AVOID TOUCHING THE
EXPOSED CIRCUIT BOARD AND CONNECTOR PINS ON THE BOARD.
1)
This subtask applies to reinstallation of an existing battery that was removed for inspection and
testing.
2)
See Figure 25.
Figure 25 Battery Pack Installation
3)
Apply a thin coating of non-petroleum based silicone grease, such as GE G-635, to the rubber seal to
facilitate installation and allow the ELT and battery pack to slide together without binding on the
rubber seal.
4)
Lay the battery pack and ELT on their sides, such that the two components are aligned, but
separated enough to allow the electrical connections to be made.
5)
Connect the ELT lead 8-pin connector to the header on the battery pack circuit board.