![Artesyn Embedded Technology ATCA-F125 Installation And Use Manual Download Page 27](http://html.mh-extra.com/html/artesyn-embedded-technology/atca-f125/atca-f125_installation-and-use-manual_2977763027.webp)
Hardware Preparation and Installation
ATCA-F125 (6873M Artwork) Installation and Use (6806800J94K)
27
2.3.2
Thermal Requirements
In order for the ATCA-F125 to cool properly when the operating temperature is at the
maximum (55C), the chassis must meet or exceed CP-TA B.3 ATCA Chassis Specification. CP-TA
B.4 compliance is preferred.
Contact your Artesyn Embedded Technologies sales representative for current information on
the detailed thermal information including airflow and resistance of the blade.
System Overheating
Cooling Vents
–
Improper cooling can lead to system damage and can void the manufacturer's
warranty.
–
To ensure proper cooling and undisturbed airflow through the system, do not
obstruct the ventilation openings of the system. Make sure that the fresh air supply
is not mixed with hot exhaust from other devices.
Personal Injury
During operation, hot surfaces may be present on the heat sinks and the components
of the product.
To prevent injury from hot surface, do not touch any of the exposed components or
heatsinks on the product when handing. Use the handle and face plate, where
applicable, or the board edge when removing the product from the enclosure.
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from