Install the second ridge cap 6868
overlapping the fi rst ridge cap while
installing two roof panels 6529. Hint:
The bolts on the ridge cap need to
be left loose to move the ridge cap
to the side and overlap the ribs of the
next roof panel. Continue weather
stripping the ridge.
2
Install the third ridge cap 6869
overlapping the second ridge cap
while installing the remaining two
roof panels 6529. Hint: The bolts
on the ridge cap need to be left loose
to move the ridge cap to the side and
overlap the ribs of the next roof panel.
Continue weather stripping the ridge.
3
Install the left 6641 and right roof
panel 6640 as you unroll the weather
stripping tape, and press it down.
Fasten the lower end of the panels
to the side wall angles using screws
and washers.
4
Fasten the roof panel ribs, peak
cap and ridge cap together using
bolts and nuts.
6868 Ridge Cap (1)
6529 Roof Panel (4)
6869 Ridge Cap (1)
6641 Left Roof Panel (1)
6640 Right Roof Panel (1)
Step 18
SX31 ctr
Parts Needed For
Ridge Cap & Panels
Weather
Stripping Tape
STEP
3
6868
6529 Roof Panel
6529
Roof Panel
6869
6529
6640
6641
6529
Peak Cap
Cut Weather Stripping
and Fold Under
STEP
4
STEP
1
STEP
2
(88)
(24)
31