background image

11

Remove from bag of screws

and save for the last step

67293

Weather Stripping (1)

5971

Roof Beam Bracket (4)

66382

Lower Door Guide (4)

66242

Door Slide (4)

66183

Roof Trim Cap

(2 right & 2 left)

65020

Door Washer (14)

(Packed with Screws)

66045

Handle (2)

66646

Washer (216)

(6 sheets of 40)

65109

#8-32 Acorn Nut (14)

(Packed with Screws)

67468 (Arrow Logo)

Peak Cap (2)

65004

#8Ax5/16" Screw (320)

65923

#8-32x3/8" Bolt (147)

65900A

#10Bx1/2" Black Screw (4)

(Packed with Screws)

65103

#8-32 Hex Nut (161)

Hardware

      Y11

6228

Track Support (2)

65958

#8-32x7/8" Bolt (14)

(Packed with Screws)

Summary of Contents for 697.68618 instruc

Page 1: ...LOVES WHEN HANDLING METAL PARTS 708850107 Model No VD108 A 697 68618 Owner s Manual Assembly Instructions Y01 Exterior Dimensions Interior Dimensions Door Approx Foundation Storage Area Roof Edge to R...

Page 2: ...the ground Available by mail order or at your local dealer or you may construct the foundation and anchoring system of your choice Your assembly instructions provide information on a few methods comm...

Page 3: ...Whenever possible two or more people should work together to assemble your building One person can position parts or panels while the other is able to handle the fasteners and the tools Tools and Mat...

Page 4: ...trate your total weight on the roof of the building When using a step ladder make sure that it is fully open and on even ground before climbing on it Keep children and pets away from worksite to avoid...

Page 5: ...icate door track annually with furniture polish or silicone spray Keep doors closed and locked to prevent wind damage Fasteners Use all washers supplied to protect against weather infiltration and to...

Page 6: ...slab Each kit containsheavy duty hot dipped galvanized steel corner gussets and perimeter clips which fit over the floor frame and lag bolt into a concrete slab Full assembly instructions and a 1 4 m...

Page 7: ...THIS PAGE WAS LEFT BLANK INTENTIONALLY 7...

Page 8: ...THIS PAGE WAS LEFT BLANK INTENTIONALLY 8...

Page 9: ...penny galvanized nails Measure 16 24 40 6cm 61cm sections to construct inside frame see diagram Secure plywood to frame using 4 penny galvanized nails Allow 6 7 hours for construction OPTION 3 Concret...

Page 10: ...it and installation instruction AnchoringintoConcrete 1 For poured concrete slab or footing or patio blocks Use 1 4 x 2 Lag Screws 2 For Anchor Post of Concrete poured after building is erected Use 1...

Page 11: ...rim Cap 2 right 2 left 65020 DoorWasher 14 PackedwithScrews 66045 Handle 2 66646 Washer 216 6 sheets of 40 65109 8 32AcornNut 14 PackedwithScrews 67468 ArrowLogo Peak Cap 2 65004 8Ax5 16 Screw 320 659...

Page 12: ...l Angle 2 13 9340 Right Side Wall Angle 2 14 9365 Front Wall Channel 2 15 7311 Door Jamb 2 16 9344 Siding Stud 6 17 8584 Side Siding 12 18 7483 Roof Panel 4 19 8736 Rear Siding 6 20 8486 Ridge Cap 1 2...

Page 13: ...12 22 22 13 17 6 16 17 11 9 22 22 22 22 22 22 34 4 19 19 25 16 17 17 8 9 34 35 16 17 10 23 18 8 18 19 19 19 27 28 7 13 16 24 17 17 17 17 17 17 10 10 21 21 21 21 21 21 11 2 3 5 5 31 33 15 30 10 19 6 6...

Page 14: ...he holes in these pieces will align when the pieces are positioned with cor rect amount of overlap See the illus trations below for the proper overall lengthofthesideandrearfloorframes Join the frames...

Page 15: ...ne bolt in the center hole 2 Make two right and left side wall angles by overlapping the right and left side wall angle pieces as shown Fasten each set together with one bolt in the center hole 3 Set...

Page 16: ...not insert bolts yet 2 Take two of the pressed together roof beams and join them as shown toformthemainroofbeamassembly Hold the assembly together and fas ten with 14 bolts Build only one Doubled Bea...

Page 17: ...as shown 2 Insert four screws from the under side only Hint The holes in the top side of the doortrackassemblyareforfastening the gable to the top of the front wall in a later step 3Positiondoorslides...

Page 18: ...h from the bottom with nuts on top 2 Measure the floor frame diago nally When the diagonal measure ments are equal the floor frame is square NOTE If using a wood platform or concrete slab do not faste...

Page 19: ...ore than one person Do not continue beyond this point if you do not have enough time to com plete the assembly today A partially assembled building can be severely damaged by light winds The top frame...

Page 20: ...ermine if post is centered on angle 2 Fasten splice posts to the sides of building in the same manner 3 Fasten the top of the door jambs to the door track with 2 screws Do the same for the bottom into...

Page 21: ...bottom tab large hole out side floor frame Do not fasten tab at this time Repeat procedure for the remaining studs around the building 3 Place front wall channel into position behind corner post and...

Page 22: ...ing panels to stud at this overlap 3 Install side siding to the top as before 4 From inside building fasten siding to corner posts and splice post using screws 5Repeatsteps1through4foroppo site side o...

Page 23: ...er post and door jamb This siding is fastened from the inside using screws into post and jamb 4 Install front siding to complete both front sections 8736 Rear Siding 6 8737 Front Siding 6 Parts Needed...

Page 24: ...them before continuing 1 Attach the four roof beam brackets to the gables using two bolts washers and nuts NOTE Mounting leg of bracket must face toward center of gable and holes closest together mus...

Page 25: ...est to center gable leg 2 Join the left and right gables together with a gable brace using a bolt in the bottom hole only 3 Repeat Steps 1 2 for the door track on the front of building except for the...

Page 26: ...er end of the main roof beam to the gable brace of the rear gable 3 Fasten the single roof beams small holes on top as shown using bolts Main Roof Beam 1 Single Roof Beam 2 Parts Needed For Roof Beams...

Page 27: ...nd holes will align NOTE If a Roof Beef Up Kit was purchased assemble prior to attaching the roof panels 1 Locate the roof panels by their numbers Note the sequence and position they are to be install...

Page 28: ...e Step 15 Y28 Parts Needed For RoofAssembly 28 8468 Right Roof Panel 1 8469 Left Roof Panel 2 7483 Roof Panel 2 6529 Roof Panel 2 8840 Ridge Cap 1 2 Cut 4 short 2 5cm strips off the roll of weather st...

Page 29: ...Trim Cap 8486 Roof Trim Peak Cap 3 STEP STEP 5 8836 6 3 Attach the right and left side roof trim to the lower end of the roof pan els on each side of the building using screws at each panel overlap NO...

Page 30: ...ide the door and fasten to door using 5 bolts and nuts 3 Put a horizontal door brace onto thetopedgeandbottomedge cover ing edge of foam board and fasten with 1 bolt in the center 4 Attach the lower d...

Page 31: ...s in the door slides 3 Fasten the door to the door slides using a 10Bx1 2 screw NOTE The four holes in the top of each door allow you to adjust the doors Place the door slide in the middle 2 holes 4 R...

Page 32: ...it appears 1 Avoid nicking or scraping the coating surface inside and out 2 Use all the washers supplied In addition to pro tecting against weather infiltration the washers pro tect the metal from bei...