background image

XCHANGE ERV

EXTERNAL MOUNT

XEM - INSTALLATION & OPERATION MANUAL

COMMISSIONING CHECKLIST

GENERAL

Air Filters: Overall Size and Number

Drain Pipe Traps and Vents fitted to Indoor Unit as per Installation Instructions

Y    /    N

Drain is Clearing Water Properly

Y    /    N

Check Vibration of Unit

OK    /    EXCESSIVE

Belt Tensioning Adjusted

Y    /    N

Paint Finish Checked and Repaired

Y    /    N

DUCTING

Total Return Air Flow (Total of all inlets) (L/s)

Total System external resistance

 (Pa) 

Measured downstream of fan outlets plus upstream of Coil (s)

Estimate of Fresh Air Make Up (% or L/s)

 

ELECTRICAL

Supply Voltage

Supply Unit Fan Motor Amps

Exhaust Fan Motor Amps

Total Unit Amps

Thermostat Settings (ºC)

Thermostat Operating Correctly

Y    /    N

Contactors & Relays Operating Correctly

Y    /    N

All Terminals Checked for Tightness and Label signed

Y    /    N

EVAPORATIVE COOLING PADS

Water Pump Operating Correctly

Y    /    N

Even Distribution of Water over Celdek Pad

Y    /    N

Sump Level is correct when unit is turned off

Y    /    N

 9

Summary of Contents for XEM 500

Page 1: ...XEMINSTALLATION OPERATIONMANUAL XCHANGEERV EXTERNALMOUNT XEM500 XEM900 XEM1200 XEM1700 XEM2000 XEM2500 XEM3500 XEM4500 XEM5000 XEM6000 XEM7000 XEM8000 ...

Page 2: ......

Page 3: ...ge media are available Every proposed installation must be subject to an engineered design by a mechanical services consultant Armcor Air Solutions is not responsible for performance of equipment in applications for which the equipment was not designed or specified Only trained and qualified personnel should install repair or service heat recovery and or air handling equipment Installing and servi...

Page 4: ...e pad to be used under the base frame and flexible couplings be fitted to the supply and return ducts to reduce any vibration transfer The location of the fresh air inlets must adhere to the Australian Standards 1668 2 The fresh air intake should be positioned clear of any objects which could obstruct the airflow and be a minimum distance of 6 metres from any exhaust discharge ducts from this unit...

Page 5: ...NOTE All units should be lifted into position using SLINGS and not CHAINS Chains may damage exterior finish on the fan unit Where units have to be craned into position installers must check unit weight is within the safe tolerance of the working capacity of the crane Prepare for lifting with spreaders as you would do with lifting air conditioning equipment When lifting equipment never stand under ...

Page 6: ...construction and commissioning Where a Heat Exchanger is incorporated in the equipment warranty is void if filters are not fitted IMPORTANT NEVER OPERATE A UNIT WITHOUT FILTERS FITTED TO THE RETURN AND FRESH AIR INTAKES The power requirement and voltage are detailed on the equipment technical specifications available on our website www armcor com au and are on the identification serial no plate at...

Page 7: ...ailable for units fitted with Certrifugal Fans OPTION 1 AND 2 DO NOT REQUIRE ANY CHANGES TO THE FAN POSITIONS INSIDE THE UNIT RETURN AIR Air that is drawn from conditioned area EXHAUST AIR Ducted to outside the building or into the roof space if adequate ventilation is available FRESH AIR Use a fresh air cowl or grill to introduce fresh air SUPPLY AIR Connect to the Airconditioning system or direc...

Page 8: ...eaned once a month and the filter media should be replaced every 12 months Repeat the monthly schedule Check blower wheels for dirt build up and tightness on shaft Check all cabinet panels for correct fitting alignment and seals and clean cabinets as required Ensure no insulation has been detached from the panels All electrical terminals should be checked for tightness IMPORTANT Ensure the with ma...

Page 9: ... and travel changes for work performed or parts supplied outside of all capital cities in Australia Field wiring refrigerant pipe run between units the condensation drainpipe or other accessories Any warranty work performed by Armcor Air Solutions outside of Melbourne metro area will require the installing contractor to provide free of charge Oxy Acetylene Equipment Dry Nitrogen Vacuum Pump Refrig...

Page 10: ...ons Ensure supply cable is correct size Check the required supply voltage is available on all phases Check overload settings are correct if applicable FILTERS Check that both the fresh air and return air have adequate filters before starting unit STARTING UNIT Check Fans and Air Flows Turn on all circuit breakers Make sure all dampers are open Turn on control circuit and activate fans Turn on supp...

Page 11: ...rn Air Flow Total of all inlets L s Total System external resistance Pa Measured downstream of fan outlets plus upstream of Coil s Estimate of Fresh Air Make Up or L s ELECTRICAL Supply Voltage Supply Unit Fan Motor Amps Exhaust Fan Motor Amps Total Unit Amps Thermostat Settings ºC Thermostat Operating Correctly Y N Contactors Relays Operating Correctly Y N All Terminals Checked for Tightness and ...

Reviews: