XEP Installation Manual

14

8.4

8.5

Three Monthly Checks Maintenance Schedules

 

 Repeat the monthly schedule.

 

Check blower wheels for dirt build-up and tightness on shaft.

 

 Check all cabinet panels for correct fitting, alignment and seals, and clean cabinets  
as required. Ensure no insulation has been detached from the panels.

 

 All electrical terminals should be checked for tightness.  

IMPORTANT – Ensure the with main switch is turned off.

 

 Check and clean heat exchangers, heating/cooling coils, drain trays and outlets.  
(If applicable). Vacuum or brush clean as necessary.

Annual Maintenance Schedules

 

Repeat monthly and three monthly checks.

 

Check cabinet for any paint chips or abrasions and treat accordingly.

 

Check and record the available voltage and amperage of each phase.

 

Check and record the amperage of each motor against nameplate details.

 

Check and record refrigerant gas pressures (if applicable).

/ 8. Maintenance Schedule

Summary of Contents for AHU 25000

Page 1: ...Armcor XEP Installation Manual 1 XEP Packaged Airconditioning Unit XEP 500 XEP 8000 Installation and Operation Manual...

Page 2: ...onfiguration suits external rooftop or ground level applications and include energy saving EC Plug Fans and the option of enthalpy or sensible heat exchange media Every proposed installation must be s...

Page 3: ...lified personnel should install repair or service heat recovery and or air handling equipment Installing and servicing equipment can be hazardous due to electrical and mechanical components When worki...

Page 4: ...le 800mm clearance for electrical connections 1200mm for all access doors on the unit or if no access door is provided 1200mm from the front of the unit Every proposed installation must be subject to...

Page 5: ...any openable windows Drainage Equipment should be installed with a positive fall to ensure water drains away freely through drain outlets Drain lines must be as large as or larger than the fitting to...

Page 6: ...PPARENT DO NOT LIFT UNIT ON TO SITE WITHOUT PRIOR APPROVAL FROM ARMCOR The unit was tested and inspected prior to packing and was in perfect condition at the time at time of despatch Check unit rating...

Page 7: ...nditions Only lift when weather conditions are favourable Lifting with a Forklift Exercise extreme caution when lifting with a forklift Do not exceed the height limit of the forklift and never allow t...

Page 8: ...mum of 1000mm of straight duct directly after the fan outlet Filters 50mm panel filters are a minimum recommendation for all equipment Filters must be fitted to fresh air and or return air Where there...

Page 9: ...breaker mounted back at the distribution board to provide local isolation during service and maintenance periods Main cables and control circuit wires are to be connected as per wiring diagram All wi...

Page 10: ...pply Air Exhaust Condensor Air Return Air Fresh Air Return Air Air that is drawn from conditioned area Exhaust Air Air discharged to outdoors Fresh Air Use a fresh air cowl or grill to introduce fresh...

Page 11: ...visible during operation after the unit has stabilised Sight Glass Sight glass is not necessarily clear Do not charge on sight glass with reverse cycle systems Digital Compressor Control Board TX Valv...

Page 12: ...trapped externally to the unit Compressor Bracket Do not remove compressor bracket this bracket is for transport and for the operation of the compressor Electrical Connection Tighten all electrical co...

Page 13: ...ly Maintenance Schedules Monthly maintenance is usually focused on air filters and visual checks to monitor any operational deficiencies The type of filter and frequency of cleaning should be addresse...

Page 14: ...be checked for tightness IMPORTANT Ensure the with main switch is turned off Check and clean heat exchangers heating cooling coils drain trays and outlets If applicable Vacuum or brush clean as necess...

Page 15: ...ication abuse alteration tampering or servicing by anyone other than an authorized person Damage resulting from incorrect installation commissioning or use other than in accordance with the installati...

Page 16: ...nal items Regular service has not been carried out by an appropriate Armcor approved licenced installer The unit is used other than for the heating and cooling of air for human comfort unless approved...

Page 17: ...is not rubbing against other pipes due to movement during transport Leak test all caps and pressure connections after commissioning Starting Unit Check Fans and Air Flows Turn on all circuit breakers...

Page 18: ...e with published Compressor Amps Outdoor Fan Motor Amps Indoor Fan Motor Amps Boost Heater Element Amps Total Unit Amps Thermostat Settings C Thermostat Operating Correctly Y N Contactors Relays Opera...

Page 19: ...Fresh Air Indoors For more information W armcor com au E sales armcor com au P 03 8301 9200 109 111 Northcorp Blvd Broadmeadows Vic 3047...