Maintenance  

Schedule

8.

/ 7. Maintenance Schedule

8.1

8.2

8.3

General

 

All Armcor equipment is designed for easy maintenance.

 

 Preventative maintenance programs will vary according to actual operating conditions 
and location and hours of usage by the client.

 

 Armcor Air Solutions are pleased to provide expert advice on special service 
maintenance requirements for particular installations.

 
 

IMPORTANT: Failure to carry out regular maintenance with a licensed and reputable 
service company may render warranty claims invalid, if faults have been caused by 
lack of proper maintenance. Armcor Air Solutions may request to see the maintenance 
schedule carried out.

Monthly Maintenance Schedules

 

 Monthly maintenance is usually focused on air filters and visual checks to monitor 
any operational deficiencies. The type of filter and frequency of cleaning should be 
addressed by the installing contractor to suit the customer’s requirements.

 

 Filters should be inspected immediately after installation to confirm the frequency  
of cleaning needed for the particular location. Regular change/clean of filters is 
necessary to ensure normal operating conditions.

 

Check condensate drain (if applicable) for free drainage.

Guide to How Frequency According to  

Usage is Established

 

 

Disposable Corrugated Filters. 

Ordinary disposable corrugated filters should last 

approximately one month in normal commercial use, or longer depending on usage.

 

 Cleanable  Filters.

 If filters are cleanable, they should be cleaned once a month and  

the filter media should be replaced every 12 months.

Summary of Contents for AHU 25000

Page 1: ...Armcor XEP Installation Manual 1 XEP Packaged Airconditioning Unit XEP 500 XEP 8000 Installation and Operation Manual...

Page 2: ...onfiguration suits external rooftop or ground level applications and include energy saving EC Plug Fans and the option of enthalpy or sensible heat exchange media Every proposed installation must be s...

Page 3: ...lified personnel should install repair or service heat recovery and or air handling equipment Installing and servicing equipment can be hazardous due to electrical and mechanical components When worki...

Page 4: ...le 800mm clearance for electrical connections 1200mm for all access doors on the unit or if no access door is provided 1200mm from the front of the unit Every proposed installation must be subject to...

Page 5: ...any openable windows Drainage Equipment should be installed with a positive fall to ensure water drains away freely through drain outlets Drain lines must be as large as or larger than the fitting to...

Page 6: ...PPARENT DO NOT LIFT UNIT ON TO SITE WITHOUT PRIOR APPROVAL FROM ARMCOR The unit was tested and inspected prior to packing and was in perfect condition at the time at time of despatch Check unit rating...

Page 7: ...nditions Only lift when weather conditions are favourable Lifting with a Forklift Exercise extreme caution when lifting with a forklift Do not exceed the height limit of the forklift and never allow t...

Page 8: ...mum of 1000mm of straight duct directly after the fan outlet Filters 50mm panel filters are a minimum recommendation for all equipment Filters must be fitted to fresh air and or return air Where there...

Page 9: ...breaker mounted back at the distribution board to provide local isolation during service and maintenance periods Main cables and control circuit wires are to be connected as per wiring diagram All wi...

Page 10: ...pply Air Exhaust Condensor Air Return Air Fresh Air Return Air Air that is drawn from conditioned area Exhaust Air Air discharged to outdoors Fresh Air Use a fresh air cowl or grill to introduce fresh...

Page 11: ...visible during operation after the unit has stabilised Sight Glass Sight glass is not necessarily clear Do not charge on sight glass with reverse cycle systems Digital Compressor Control Board TX Valv...

Page 12: ...trapped externally to the unit Compressor Bracket Do not remove compressor bracket this bracket is for transport and for the operation of the compressor Electrical Connection Tighten all electrical co...

Page 13: ...ly Maintenance Schedules Monthly maintenance is usually focused on air filters and visual checks to monitor any operational deficiencies The type of filter and frequency of cleaning should be addresse...

Page 14: ...be checked for tightness IMPORTANT Ensure the with main switch is turned off Check and clean heat exchangers heating cooling coils drain trays and outlets If applicable Vacuum or brush clean as necess...

Page 15: ...ication abuse alteration tampering or servicing by anyone other than an authorized person Damage resulting from incorrect installation commissioning or use other than in accordance with the installati...

Page 16: ...nal items Regular service has not been carried out by an appropriate Armcor approved licenced installer The unit is used other than for the heating and cooling of air for human comfort unless approved...

Page 17: ...is not rubbing against other pipes due to movement during transport Leak test all caps and pressure connections after commissioning Starting Unit Check Fans and Air Flows Turn on all circuit breakers...

Page 18: ...e with published Compressor Amps Outdoor Fan Motor Amps Indoor Fan Motor Amps Boost Heater Element Amps Total Unit Amps Thermostat Settings C Thermostat Operating Correctly Y N Contactors Relays Opera...

Page 19: ...Fresh Air Indoors For more information W armcor com au E sales armcor com au P 03 8301 9200 109 111 Northcorp Blvd Broadmeadows Vic 3047...

Reviews: