PDS-32/42/46/47/52/55
www.
Armagard
.com
Installation Manual Page |
4
Toll Free (US):
1-866-434-0807
Call (UK):
0121-608-7210
(HALFWAY LINE)
STEP
7
:
Prepare a surface area to turn your display over, using appropriate covers to prevent any
damage being caused to its front.
STEP
8
: Turn your display over and using measuring tape, determine the halfway line of the unit.
STEP
10
: Using the diagram shown in Figure4, fasten the brackets with the 4 or 6 screws suited to
your LCD Display type.
Figure 3
Figure 4
STEP
9
: For a balanced unit, align the centre hole of the bracket with the halfway line of your
display (Figure3) and determine equally spaced screw fittings, taking into account the
size of your display (adjustment may be required depending on screen type).
(NOTE: All cabling should now be complete; access to the back is limited once the display is secured)
DISPLAY BRACKETS