EC131 Chain Link Mesh Installation
Quick Start Guide Rev001
Customer Support
1 800 371 0735
A Division Of Countermeasures Security Solutions Inc.
Page | 15
ARMA EC131 Chain Link Mesh Installation
Please refer the following details to Steps 1) through 9) above.
There is one (1) Chain Link Mesh Kit for each EC131 Gate Panel.
1) Insert 1
st
Tension Band
a) Open the boxes and unwrap and set the components aside ensuring they are not
dinged or damaged in the process. Make sure the bag of hardware is not
discarded with the wrapping.
b) Orient your workspace so you are on the Bearing Truck / Post side of the EC131
Gate.
c) Roll out one Chain Link Mesh section ensuring that all the links are neatly spread
out checking for kinks or stuck ends. Free up any hung-up sections until the
Mesh is flat on the ground.
d) Slide the first Tension Bar into the space between the first and second Mesh
links.
2) Position Mesh onto Gate
a) Carefully lift the Mesh section into place against the first Gate Panel and position
the Tension Bar side of the Mesh near the left most Gate Panel Upright.
b) This can be done with one person but is easier with two people.
3) Install First Offset Tension Band
a) Take half of the supplied Offset Tension Bands and Carriage Bolts and place
them in a safe place. They will be used in Step 8). The other half will be used
now.
b) Push one Tension Band over the Gate Panel Upright ensuring that the Tension
Bar and Mesh slide in between the two legs of the Tension Band.
c) You may need to spread the Tension Band to get it over the Gate Upright.