17
2.5 Water
connections
*HQHUDOUHTXLUHPHQWV
7KHSLSHVPXVWEH¿WWHGZLWKDQDSSURYHGVKXWRIIYDOYH
Water connections should meet the requirements according to the
table below.
&ROGZDWHU%OXH
Warm water (Red)
Connection
PP
PP
Pressure
100 - 800 kPa
100 - 800 kPa
Flow rate
20 l/min at 400 kPa
pressure
20 l/min at 400 kPa
pressure
Temperature
At least 2°C, but less
than 20°C
45 – 60°C
5HTXLUHPHQWVIRU.,:$FHUWL¿HGLQVWDOODWLRQV
Use KIWA approved check valves from Arjo (A) between the water
connections (B) and the machine water hoses (C).
002396
C
A
B
Figure 8. Installation of check valves
2.5.3 Connect
water
Connect the water as follows:
1.
Check that the requirements for pipes and water connections
are met.
2
Connect the water.
)RU.,:$FHUWL¿HGLQVWDOODWLRQVFKHFNWKDWWKHFKHFNYDOYHV
are attached correctly.
4. Seal all connections with PTFE tape.