1. Boiler water overheating protection DN 15
2. Spare DN 15
3. Boiler water temperature sensor DN 15
4. Fire chamber sensor connection DN 15 (BC40 DN 20)
5. Fire chamber sensor connection DN 20 (BC40 DN 15)
6. Cold water Ø 22 Cu
7. Warm water Ø 22 Cu
8. Plate heat exchanger
9. Heat exchanger pump
10. Bleeding screw for the water network
11. Expansion / relief valve DN 25
12. Flow to network DN 50
13. Return from network DN 50
14. Electric resistance connection DN 50
15. Drain connection DN 20
16. Burner opening, right or left side
17. Maintenance hatch
18. Viewing screen
19. Front convector cleaning hatch
20. Rear convector cleaning hatch
21. Ash hatch
22. Cleaning hatch
23. Convector cleaner motor
24. Ash screw motor
25. Ash screw
26. Smoke duct Ø 139
27. Biojet cooling connections
DIMENSIONS
Summary of Contents for BioComp 120 kW
Page 1: ...INSTALLATION OPERATION AND MAINTENANCE For a sustainable future BioComp 40 150 kW ...
Page 12: ...12 ...
Page 22: ...22 DECLARATION OF CONFORMITY ...
Page 28: ...28 NOTES ...
Page 29: ...29 NOTES ...
Page 30: ...NOTES 30 ...
Page 31: ...31 NOTES ...