background image

ARITERM SWEDEN AB

 

 

Installation, Operation & Maintenance - 

2008.11.18- 7/28

 

BURNER OVERVIEW

9

7

1.  Bottom plate 
2.  Controll card
3.  Clutch wheel
4.  Primary ring
5.  Airbox
6.  Fan
7.  Optical monitor tube
8.  Sluice gate

9.  Auger motor
10.  External auger motor
11.  Chain
12.  Auger tube
13.  Burn pot
14.  Top coupling
15.  Level monitor, receiver
16.  Burner skrew

1

2

3

4

5

8

10

11

13

12

14

15

16

 

WIRING DIAGRAM

Summary of Contents for Bionet+ 12

Page 1: ...ARITERM SWEDEN AB Installation Operation Maintenance 2008 11 18 1 28 INSTALLATION OPERATION AND MAINTENANCE Bionet 12 ...

Page 2: ... to chimney sweeping by turning off the boiler at least one hour before cleaning to minimize the amount of glowing ash Warning Make sure to cut the power supply to the boiler before removing the burner housing Maintenance contract Ariterm recommends the boiler installation to be made by a company with professio nal competence For more information please contact your Ariterm retailer Replacing of s...

Page 3: ...ections Expansion Drain Flue pipe connection Recommended chimney diameter and length DN 25 male DN 15 female Ø 102 mm Ø 100 mm length min 5 m Bionet 12 art nr 4037 Standard delivery Shunt valve ESBE TM 20 Sweeping gear Combination flue for horizontal and vertical installation Accessories Burner assembly kit Shunt outlet Dimensions including comb flue pipe is app 1390 mm 1 Shunt outlet DN 25 male 2...

Page 4: ...shunt connection for shunt valve ESBE TM20 is available as an acces sory for connecting to an oblique chimney inlet SAFETY AND ALARMS The boiler is designed according to the same main principles as an oil heated system The advantage of this pelletsystem is easy and comfortable handling as the location of the fuel store does not depend on the layout of the boiler room From the safety point of view ...

Page 5: ... Tank sensor 5 Bivalent shunt 6 Flow water sensor 7 Outdoor temp sensor 7b Indoor temperature sensor 8 Charging pump 9 Radiator pump 10 Safety relief valve 11 Air bleeder valve 12 Pressure gauge 13 Expansion vessel 14 Storage tank 2 BIONET Exp vessel Rad system To solar panel Preheating 1 2 1 3 7 8 4 6 5 13 10 11 9 14 11 12 ww cw cw 7b INSTALLATIONS EXAMPLE ...

Page 6: ...ARITERM SWEDEN AB Installation Operation Maintenance 2008 11 18 6 28 WIRING DIAGRAM ...

Page 7: ... Bottom plate 2 Controll card 3 Clutch wheel 4 Primary ring 5 Airbox 6 Fan 7 Optical monitor tube 8 Sluice gate 9 Auger motor 10 External auger motor 11 Chain 12 Auger tube 13 Burn pot 14 Top coupling 15 Level monitor receiver 16 Burner skrew 1 2 3 4 6 5 8 10 11 13 12 14 15 16 WIRING DIAGRAM ...

Page 8: ...imneysweep must be notied for inspection of the flue CAUTION The boiler has low flue gas temperatures which under certain conditions might lead to condensation of flue gases INSTALLATION 30 Mortar Flue pipe 30 mm incom bustible insulation Imbedment into chimney A 1560 mm exkl ställbara fötter Golv Ø200 mm Water piping shall be carried out in accordance with current local and national hot water and...

Page 9: ...Also the use of a safety switch burner switch is recommended Work on the boiler may only be carried out by a qualified serviceman Make sure to cut the power supply to the burner before servicing WATER PIPING Before you begin heating the heating system must be filled with water To fill the system do as follows Open all shut o valves including the shunt valve 1 The pump must be switched off Fill the...

Page 10: ...lly the burn pot does not demand any particular care but should be checked for carbon build up in connection with ash removal If necessary scrape off any carbonisation Put the burner back into place check carefully that no sealing is damaged Once a year to once every second year Clean the primary ring and primary air tube on the inside to remove dust and chips Check the pins of the metering wheel ...

Page 11: ...AL MANUAL OFF OPERATINGMODE MAX TEMPERATURE FLUE GAS xx C OPERATING TIME press plus key PELLETS STORE press plus key SERVICE press plus key LEFT X d 0 0 t 0 0 kg h AVERAGE 0 0 kg d TOTAL 0 0 t TOTAL XX h MIN 0 0 t ALARM ASH REMOVE X x ALARM CLEANING 0 Xh FLUE GAS XXX C MAX 240 C BURNER TYPE 12kW POWER HIGH AUGER 50 POWER HIGH FAN 36 POWER LOW AUGER 50 POWER LOW FAN 36 POWER MIN AUGER 0 POWER MIN F...

Page 12: ...NB The time needed to run the cold start firing procedure may vary due to differing amounts of fuel in the burner s auger pellet quality etc Do not interfere with the ignition by letting light enter through the boiler s hatch The burner s electric ignition program takes about 20 minutes If ignition fails the burner will automatically turn itself off which is indicated by the red lamp It is also po...

Page 13: ... do the following Press arrow forward and arrow backward at the same time for 5 seconds The message Service is shown on the display panel The control unit is now at the service menu Move forward in the service menu by pressing arrow forward If you do not press any of the control keys the control unit will revert to menu 1 automatically after 8 minutes There are two more service levels but they are...

Page 14: ... min Minimum power level during operating time only displayed when the min operating level is activated Operating time electric el1 Operating time of the resistor 1 The number of electric resistors vary bet ween models Biomatic function Operating time electric el2 Operating time of the resistor 2 Biomatic function Pellets store press plus key Press the Plus button and then the arrow button forward...

Page 15: ... Address 0 Not used Default set vXXXX Displays the version number of the processor and enab les resetting the factory settings The factory settings can reset by pressing the Plus button Description of menu 3 Power Power In order to activate this menu select number 5 in the Service Power menu by pressing the Plus button Wait until the number stops flashing and continue by pressing the arrow button ...

Page 16: ... EL STEP 0 0 LEVEL MONITOR XX 50 OPTICAL MONITOR XX 50 TEST OUTPUTS Press plus key POWER 0 ENGLISH ADDRESS DEFAULT SETTINGS vXXXX DIFF TANK NO AUGER EXTERNAL 0 FAN 0 AUGER BURNER 0 IGNITION 0 ALARM 0 EL STEP 0 Service meny shows when pushing same time buttoms and for 5 sec Power menu is available when nr 0 is changed to nr 5 Move forward when nr on display stops winking MAIN MENU SERVICE MENU POWE...

Page 17: ...dy that the motor shaft rotates the auger and the motor of the external auger operates In most cases the default setting of the operating time of the external auger 30 seconds is not long enough to bring suf ficient amount of pellets to the burner If the problem cannot be removed by me ans of the above checks and remedies the operating time of the external auger may be too short In such cases incr...

Page 18: ...not detected light du ring a certain period of time No fuel has entered into the combus tion head is there fuel in the upper connection If there is no fuel in the upper con nection of the burner check the cable connections of the level switches If this does not help wipe the level swit ches clean If the external feed of the burner does not start in spite of this or the level switches must be clean...

Page 19: ...pply as for a sto re designed for bulk deliveries A common way is to start with a small and simple pellet store which is a quick and simple solution It demands a bit of handling however both when you pick up the pellets from your supplier and when you fill them into your store For this kind of store pellets can be acquired in small sacks normally between 6 20 kg or large sacks normally between 500...

Page 20: ...safety grate and a cover NOTE Installation of PS300 Feedo see separate manuals for each product Depo The Depo discharge chute is a patented transport solution that efficiently functionally and at a low noise level feeds pellets from storage via a conveyor to the burner The Depo is particularly appropriate in combination with the Feedo screw conveyor Feedo The Feedo screw conveyor provides safe pro...

Page 21: ...ARITERM SWEDEN AB Installation Operation Maintenance 2008 11 18 21 28 FEEDING SYSTEM WEEKLY STORAGE 602 mm 1500 mm 606 mm 1208 mm 699 mm 606 mm 758 mm 920 mm 602 mm 602 mm ...

Page 22: ...ARITERM SWEDEN AB Installation Operation Maintenance 2008 11 18 22 28 FEEDING SYSTEM DEPO FEEDO 606 mm 1500 mm ...

Page 23: ...ARITERM SWEDEN AB Installation Operation Maintenance 2008 11 18 23 28 FEEDING SYSTEM DEPO FEEDO 606 mm 758 mm 920 mm ...

Page 24: ...ARITERM SWEDEN AB Installation Operation Maintenance 2008 11 18 24 28 DECLARATION OF CONFORMITY NOTES ...

Page 25: ...ARITERM SWEDEN AB Installation Operation Maintenance 2008 11 18 25 28 NOTES ...

Page 26: ...ARITERM SWEDEN AB Installation Operation Maintenance 2008 11 18 26 28 NOTES ...

Page 27: ...water reaches desired temperature boiling risk If these instructions are not followed during installation operation and maintenance the obligations of Ariterm AB under the warranty regulations are no longer binding Ariterm reserves the right to alter any details and specifications without prior notice Flue gas temp High CO O2 CO2 Air fuel ratio Efficiency Draught i mm Fan Effect Flue gas temp Low ...

Page 28: ...ARITERM SWEDEN AB Installation Operation Maintenance 2008 11 18 28 28 Ariterm Sweden AB Flottilvägen 15 39241 Kalmar Sweden www ariterm se 46 480 442850 ...

Reviews: