background image

ARITERM SWEDEN AB

 

  

Installation, Operation and Maintenance - 2007.10.26- 8/12

Before you begin heating, the heating system must be fi lled with water.
To fi ll the system, do as follows:
1.  Open all shut-off  valves, including the shunt valve. 

Th

  e pump must be switched off .   

2.  Fill the boiler and the radiator system with water. 

Bleed the system at the radiators.  

3.  Once the system is fi lled completely, the circulation pump can be started and 

heating can begin.  

4.  When the boiler water has reached its pre-set operating temperature, the pump 

should be stopped and the system bled at the radiators once again. Th

  is should be 

repeated several times.  

Remember that much air is enclosed in tap water. Th

  e enclosed air volume may reach 

as much as 10%, which explains why bleeding takes time – especially where there are 
large water volumes. A closed system shall be fi lled until the pressure gauge indicates 
the correct system pressure, i.e. the distance from the pressure gauge to the highest ra-
diator in meter times 0,1 which gives the system pressure in bar. Adjust the red needle 
of the pressure gauge to the same value as the big needle.

 FILLING OF WATER

 

MAINTENANCE, CARE, SWEEPING

 Boiler cleaning

Burning solid fuels, even if operation is automated, normally calls for a little more care 

and maintenance than oil heating. For Biomatic 20 maintenance has been minimized 

as the result of well planned design and a big ash box holding 50 litres. Ash is removed 

when necessary. Th

  e convection parts of the boiler are to be cleaned when the fl ue gas 

temperature has risen by 20-30˚C above the temperature of a newly swept boiler. 

ATTENTION!  Pay special attention to the pellets quality when you receive a new delivery or when 

you change supplier.
ATTENTION!  Show a great care when emptying the ash as it might be glowing hot. Ash must be 

kept in a 

fi

 reproof container. 

Th

  e following measures and checks shold be carried out when the boiler is cleaned:

• Switch off  the burner an hour before service.

• Lift the soot hatch at the top of the boiler and brush clean the fl ues.

• Remove the fi xing bolts from the burner and loosen the hose and electric connec     

   tions.

• Pull out the burner and brush clean the walls of the combustion chamber.

• Empty the ash.

ATTENTION! Disconnect the power to the boiler before removing the protective housing

ATTENTION! Show great care when emptying the ash as it can be glowing hot.

Summary of Contents for Biomatic 50

Page 1: ...INSTALLATION OPERATION AND MAINTENANCE Biomatic 50 ...

Page 2: ...tion this must always be communicated to the local building authorities Sweeping According to the fire protection laws a chimney shall be swept regularly This is done by the local chimneysweep Sweeping of the boiler shall be carried out in such a man ner that good operating economy is achieved see under Maintenance Prepare to chimney sweeping by turning off the boiler at least one hour before cleani...

Page 3: ...tt gäller exkl ställbara fötter 725 410 600 245 606 1690 264 410 500 425 1229 270 240 Ø 139 utv 389 758 728 304 162 A 1560 150 154 Kombinationsrökrör 620 130 Ø159 Ø159 50 TECHNICAL SPECIFICATION Performance Capacity range pellets 25 50 kW Dimensions Width Depth without flue pipe Height without connections Weight Water contents 606 mm 720 mm 1690 mm 452 kg 115 l Design values and settings Design pr...

Page 4: ...te maintenance work Sweeping is mainly done from the soot hatch on top of the boiler but also through the rebox door where the burner is located The boiler is designed to operate with a pellet burner Biomatic 50 consists of a combustion chamber with flue pipes which is enclosed by a jacket holding 115 litres of water Heat generated by the burner is transferred directly to the boiler water Oil heati...

Page 5: ...ircuit S20 Switch external circ pump heating circuit On Off S21 Switch internal circ pump hot water circuit continous operation TS Regulating thermostat burner TZ High limit thermostat burner THERMOSTAT CONNECTION MAINS SUPPLY MMJ 3x1 5 mm2 MAINS SUPPLY PELLER BURNER CONN EXTERNAL CIRC PUMP HEATING CIRCUIT CONN FLOW SWITCH EXTERNAL CIRC PUMP HOT WATER CIRCUIT CONN EXTERNAL CIRC PUMP HOT WATER CIRC...

Page 6: ...mended underpressure in the chimney is 25 Pa The height of the gas flue shall be dimensioned according to the building s requirements but should be at least 6 m If condensation water comes out of the flue a condensate drain pan shall be installed in the lower portion of the chimney The combustion air intake must not be covered 1 Regulating thermostat Adjustment of operating temperature for pellet bu...

Page 7: ...anufacturer s instructions In the following table you will find examples of suitable closed system expansion vessels System volume Opening pressure Initial pressure Vessel volume litre bar bar litre 70 C 90 C 500 1 5 0 5 35 80 1000 1 5 0 5 80 140 1500 1 5 0 5 80 140 2000 1 5 0 5 140 200 An open system with 500 litre water volume demands at least a 35 litre expansion vessel and a 1500 litre system v...

Page 8: ...the same value as the big needle FILLING OF WATER MAINTENANCE CARE SWEEPING Boiler cleaning Burning solid fuels even if operation is automated normally calls for a little more care and maintenance than oil heating For Biomatic 20 maintenance has been minimized as the result of well planned design and a big ash box holding 50 litres Ash is removed when necessary The convection parts of the boiler a...

Page 9: ...at you get clean and dry pellets and no fines ATTENTION Damp pellets must be rejected immediately FUEL RECOMMENDATION Raw material Chemically untreated barkless wood Diameter 8 mm Length 15 to 32 mm Volume weight over 600 kg m3 Moisture content less than 10 Ash content less than 0 7 weight Fine material content max 4 weight Melting temperature of ash 1100 C Energy content 4 75 kWh kg PELLET STORE T...

Page 10: ...ture or over pressure Any attempts made to repair the product without the manufacturer s permission or if the guarantee card has not been returned to the manufacturer will invalidate the guarantee The manufactu rer shall not be held liable for any possible indirect damage and or financial loss caus ed by the burner Ariterm AB reserves the right to decide the method how a possible guarantee repair i...

Page 11: ...emperature boiling risk If these instructions are not followed during installation operation and maintenance the obligations of Ariterm AB under the warranty regulations are no longer binding Ariterm reserves the right to alter any details and specifications without prior notice Flue gas temp High CO Retailer Installer Installed by Inst date O2 CO2 Efficiency Draught mm Fan Effect Flue gas temp Low...

Page 12: ...ARITERM SWEDEN AB Flottiljvägen 15 39241 Kalmar www ariterm se 0771 442850 ...

Reviews: