TRANSPORTATION, STORAGE AND OPENING THE PACKAGE

 

Transport

The boiler is delivered in a wooden crate secured by screws to a pallet, which means the boiler 
can be lifted safely using a standard pallet truck. The boiler should be unpacked as close to the 
installation site as possible. Ariterm's transport insurance covers any transport damage that oc-
curs during transport from the factory to the first intermediate storage location. It is important 
that the recipient of the boiler checks the boiler's condition before accepting the delivery. In case 
of damage, the transport company must be contacted immediately.

 

Storage

The boiler can be stored outside, protected against the rain. It is however best to store the boiler 
indoors. 

 

Unpacking

Check that all parts on the equipment list are present, after removing the packaging. Loose parts 
are placed inside the soot hatch, on the front of the boiler. The wooden packaging is sorted as 
combustible material and the plastic bag as plastic, at the recycling station.  

Summary of Contents for BioCompPX PX52

Page 1: ...For a sustainable future INSTALLATION AND USER INSTRUCTIONS BioCompPX ...

Page 2: ...nsions 6 Installation of the boiler 7 Pipe installation 8 9 Electrical installation 10 11 Connection box 12 Installation of the burner 14 Installation of the ash auger 15 16 Commissioning 17 Service decommissioning 18 20 Declaration of conformity 22 Standard equipment 23 Installation report 24 Warranty 25 ...

Page 3: ...e bottom of the boiler together with the ash blown out of the burner pipe The ash can be removed through a hatch at the bottom of the front and through 2 hatches one at the bottom of each side An immersion heater can be installed as an accessory on either side The immersion heater is connected to its own separate electricity supply and has a thermostat and overheat protection The output is 3 6 kW ...

Page 4: ...intermediate storage location It is important that the recipient of the boiler checks the boiler s condition before accepting the delivery In case of damage the transport company must be contacted immediately Storage The boiler can be stored outside protected against the rain It is however best to store the boiler indoors Unpacking Check that all parts on the equipment list are present after remov...

Page 5: ...ial is used by pressing or turning Turn it to toggle through the menu or other values when making an adjustment One press makes a selection or saves in the menu oCompPX Vid leverans ingår t 4PUOJOHTSFETLBQ t 4MBNmMUFS t VSOJOHTTUÚE t 3ÚLSÚS t 3ÚLHBTnÊLU t VUPNBUJL GÚS LPOWFLUJPOTSFOHÚSJOH BTLVUNBUOJOH Tillbehör t PNCJOBUJPOTSÚLSÚS BSU OS t TLVUNBUOJOH t MBOEOJOHTWFOUJM GÚS WBSNWBUUFO 75 BSU OS t 4...

Page 6: ...QQOJOH IÚHFS FMMFS WÊOTUFS TJEB 4FSWJDFMVDLB 4ZOHMBT 4PUTLÌQ NFE LPOWFLUJPOTSFOHÚSOJOH TLMVDLB 3FOHÚSJOHTMVDLPS POWFLUJPOTSFOHÚSJOH NPUPS PUPS UJMM BTLTLSVW UJMMCFIÚS TLTLSVW UJMMCFIÚS 3ÚLLBOBM NN POUSPMMQBOFMFO IBS FO EJTQMBZ PDI JTQMBZFO WJTBS ESJGUMÊHF PDI BLUV ÚSLMBSBOEF UFYU SVMMBS J EJTQMBZF VTUFSJOHTSBUUFO BOWÊOET HFOPN BO WSJEFS GÚS BUU WÊYMB J NFOZO FO KVTUFSJOH UU USZDL WÊMKFS FMMFS DIME...

Page 7: ... side Chimney connection and opening for combustion air The low temperature of the flue gas from the BioCompPX gives rise to a risk of condensation in the chimney Make sure the chimney is well ventilated with the help of draught diverter inhibi tor The chimney flue should be stainless steel or acid proof The chimney s minimum diameter should not be less than 150 mm Note for the boiler to function ...

Page 8: ...livered with integrated overheat protection However a safety valve must be in stalled close to the boiler If the return water temperature is too low it can result in a risk of corrosion Make sure the low est return water temperature is approx 60 C during operation Example of installation 1 ARITERM BIOCOMP PX 2 3 WAY VALVE RADIATOR HEAT 3 HEATING SYSTEM PUMP RADIATOR HEAT 4 RADIATOR HEATING SYSTEM ...

Page 9: ...the pipe under pressure Expansion tank The size of the expansion tank is determined as follows Closed system according to the instructions from the expansion tank s manufacturer System volume boiler volume hot water heater volume pipe volume radiator volume Production of hot tap water There is an efficient flat heat exchanger for tap water in the boilers in the BioComp series so generally speaking...

Page 10: ...sk Start Another press means you confirm and the burner starts If you turn one step clockwise instead you jump to the main menu and come to Start T Turn further to arrive at Stop T User menu and Back respectively Start T This is where you set the desired start temperature Stop T This is where you set the desired stop temperature User menu This is where you adjust the time and temperature settings ...

Page 11: ... IN Temp 1 Temp 2 Com 1 Com 2 1 2 5 4 3 P 1 N PE L U B N Y B svart N brun U VVP VVP PB PB 4 1 2 3 PB B GR PTG PTG Temperaturgivare pannvatten B 4 M M N U Y N F F U Y N B 1 2 3 N Colors B black U blue N braun Y yellow green GR grey VVP Circulation pump hot domestic water PB Pellet burner PTG Temperature sensor boiler water M Motor for convection cleaning F Fan motor ...

Page 12: ...wo securing screws on the bottom edge of the boiler s front panel 2 Loosen the front panel s securing screws on the top of the boiler 3 Connection box for soot removal motor 10 and heat exchanger pump 11 CONNECTION BOX ...

Page 13: ... hours or minutes 5 View Jump to View Menu TachoAct 000 999 Tachometer readings from fan 6 ClockSet Back Back 6 ClockSet 3 Settings 00 00 Set Time HH MM SetCode 21 01 01 01 Set Date YY MM DD 4 Service Back Ign dose 70 010 240 Ignition dose in seconds TstDose Testing of ignition dose Feed HI 10 9 0 20 Feeder HI Power mode in seconds Feed LO 7 2 0 20 Feeder LO Power mode in seconds Feed MIN 4 0 0 20...

Page 14: ...t of the run ners afterwards Connect the cables on the side of the burner INSTALLATION OF THE BURNER 1 Installation of the immersion heater 2 Installation of the thermostat Electrical operation An immersion heater 6 or 9 kW can be installed in the boiler in the DN 50 connection on the side closest to the front of the boiler 14 The immersion heater is delivered together with an adjustment overheat ...

Page 15: ... the pressure bearing in its place Mount the motor flange on the motor with 4 M8x25 screws Mount the intermediate plate on the motor flange Mount the motor on the ash auger s shaft Press the motor up to the mounting plate INSTALLATION OF THE ASH AUGER ...

Page 16: ...UGER Secure the motor in the mounting plate using 4 M10 nuts Secure the motor in the ash auger shaft with M10x20 screw Tighten the screws properly Install the bearing cover in place Ash auger with extension Ash auger with ash box ...

Page 17: ...nect to the Ø6 mm copper tube on the top of the boiler to the left of the tap water pipes The flue gas fan is adjusted separately for each output mode AirHi 2 AirLo 2 and AirMin 2 Daily operation and daily maintenance The daily operation of the boiler depends on the fuel selected and the need for heating After the combustion has been fine tuned the burner s control system is automatic and the user...

Page 18: ...sealing change if necessary Inspection Once a month Removal of ash from burner At the same time as the ash is removed from the hearth Use of a fuel rich in ash naturally increases the quantity of ash and thereby shortens the serv ice interval Service intervals The service intervals given are guide values and can vary considerably depending on the fuel se lected and the load Check the boiler more f...

Page 19: ...en emptying the ash space depend on the fuel used and the output need Check the convection section s ash space once a month and remove the ash with an ash scraper as required The intervals between emptying the convection section s ash space depend on the fuel used and the output need Clean the surfaces of the hearth at least once a year Use a round brush with a bent shaft Sweeping the hearth ...

Page 20: ...ar sooty they must be swept manually Lift the spirals out of the convection tubes Sweeping the convection section Use a tube brush with a straight shaft Go through each convection tube Push the brush all the way down to the ash space as it will then be easier to pull it back Reinstall the spi rals and close the convection section service hatch Check the pipes in the convection section and remove f...

Page 21: ...21 ...

Page 22: ...22 DECLARATION OF CONFORMITY ...

Page 23: ...No Component Article Number 1 Hearth brush 3487 2 Flue brush 3489 3 Flue brush shaft 3492 4 Heath brush shaft 1356 5 Ash rake 8530 6 Wall stand for cleaning tools 7 Flue gas temperature gauge 5883 8 Flue extension D139 mm BioComp 60 TH2 040 ...

Page 24: ...iency Draught mm Fan Screw Dealer Installer Installer Date INSTALLATION REPORT After installation the burner must be adjusted with the help of a flue gas analyser If the installation and service measures in the installations and operating instructions are not followed the warranty commitments stated are void Ariterm reserves the right to make changes without separate notification ...

Page 25: ...25 WARRANTY For warranty issues Ariterm Sweden AB refers to our local Distributor ...

Page 26: ...26 NOTES ...