BENCHMARK No.
FOR ALL BOILERS CONFIRM THE FOLLOWING
BOILER SERIAL No.
NOTIFICATION No.
CONTROLS
To comply with the Building Regulation, each section must have a tick in one or other of the boxes
THE SYSTEM HAS BEEN FLUSHED IN ACCORDANCE WITH THE BOILER MANUFACTURER’S INSTRUCTIONS?
THE SYSTEM CLEANER USED
THE INHIBITOR USED
FOR THE CENTRAL HEATING MODE, MEASURE & RECORD
GAS RATE
m
3
/hr
ft
3
/hr
BURNER OPERATING PRESSURE ( IF APPLICABLE)
N/A
mbar
CENTRAL HEATING FLOW TEMPERATURE
°C
CENTRAL HEATING RETURN TEMPERATURE
°C
FOR COMBINATION BOILERS ONLY
HAS A WATER SCALE REDUCER BEEN FITTED?
YES
NO
WHAT TYPE OF SCALE REDUCER HAS BEEN FITTED
FOR THE DOMESTIC HOT WATER MODE, MEASURE & RECORD
GAS RATE
m
3
/hr
ft
3
/hr
MAXIMUM BURNER OPERATING PRESSURE (IF APPLICABLE)
N/A
mbar
COLD WATER INLET TEMPERATURE
°C
HOT WATER OUTLET TEMPERATURE
°C
WATER FLOW RATE
Its/min
FOR CONDENSING BOILERS ONLY CONFIRM THE FOLLOWING
THE CONDENSATE DRAIN HAS BEEN INSTALLED IN ACCORDANCE WITH
THE MANUFACTURER’S INSTRUCTIONS?
YES
FOR ALL INSTALLATIONS CONFIRM THE FOLLOWING
THE HEATING AND HOT WATER SYSTEM COMPLIES
WITH CURRENT BUILDING REGULATIONS
THE APPLIANCE AND ASSOCIATED EQUIPMENT HAS BEEN INSTALLED AND COMMISSIONED
IN ACCORDANCE WITH THE MANUFACTURER’S INSTRUCTIONS
IF REQUIRED BY THE MANUFACTURER, HAVE YOU RECORDED A CO/CO2 RATIO READING? N/A
YES
CO/CO
2
RATIO
THE OPERATION OF THE APPLIANCE AND SYSTEM
CONTROLS HAVE BEEN DEMONSTRATED TO THE CUSTOMER
THE MANUFACTURER’S LITERATURE HAS BEEN LEFT WITH THE CUSTOMER
COMMISSIONING ENG’S NAME
CORGI ID N°.
SIGN
DATE
TIME & TEMPERATURE CONTROL TO HEATING
ROOM T/STAT & PROGRAMMER/TIMER
PROGRAMMABLE ROOMSTAT
TIME & TEMPERATURE CONTROL TO HOT WATER CYLINDER T/STAT & PROGRAMMER/TIMER
COMBI BOILER
HEATING ZONE VALVES
FITTED
NOT REQUIRED
HOT WATER ZONE VALVES
FITTED
NOT REQUIRED
THERMOSTATIC RADIATOR VALVES
FITTED
AUTOMATIC BYPASS TO SYSTEM
FITTED
NOT REQUIRED
GAS BOILER COMMISSIONING CHECKLIST
"
25. Benchmark Commissioning Checklist
Summary of Contents for Benchmark System A 24 RFF
Page 18: ...18 1 2 A A Fig 13 Fig 15 Fig 12 11 Installing the Boiler continued Fig 14 P P ...
Page 21: ...21 Fig 20 Fig 21 Fig 22 162 ...
Page 30: ...30 WIRING DIAGRAM FOR CONNECTION TO AN OPEN VENTED CYLINDER DIAGRAM B ...
Page 31: ...31 WIRING DIAGRAM FOR CONNECTION TO AN MTS UNVENTED CYLINDER DIAGRAM A ...
Page 60: ...60 ...