
36
1
15. Fitting the casing
M
N
R
A
Fig. 44
Fitting the casing
Remove the protective film on the casing:
- Locate the lower clips into the slots in the chassis
- Engage hooks N on the casing in notches R on the side panels M operation (Fig. 43)
- Fit the top of the panel in place
- Close the panel mounting clamps (Fig. 44)
- Screw in the two clamp locking bolts A
Note: it is essential to refit both locking bolts A
Fig. 43
Summary of Contents for Benchmark System A 24 RFF
Page 18: ...18 1 2 A A Fig 13 Fig 15 Fig 12 11 Installing the Boiler continued Fig 14 P P ...
Page 21: ...21 Fig 20 Fig 21 Fig 22 162 ...
Page 30: ...30 WIRING DIAGRAM FOR CONNECTION TO AN OPEN VENTED CYLINDER DIAGRAM B ...
Page 31: ...31 WIRING DIAGRAM FOR CONNECTION TO AN MTS UNVENTED CYLINDER DIAGRAM A ...
Page 60: ...60 ...