9 - 32
Figure 27
9.4 DISCHARGE CHUTE
Install Discharge Chute-Electric Rotation (924517)
1. Remove chute motor cover (Figure 29).
2. Remove the six nuts from ring gear (Figure 28).
3. Remove two half rings.
4. Position discharge chute over threaded studs with
the chute opening facing the electric motor.
5. Replace the half rings.
6. Replace the six nuts and tighten to 120 lbf-in.
(13.56 Nm) torque.
7. Replace chute motor cover.
Figure 28
1. Idler Pulley
2. Rake Shaft Bushing
3. Shear Bolt
4. Ball Bearing
5. Bearing Flange
1
2
4
5
3
PS1091
WARNING: DO NOT put hands or feet near
or under rotating parts. Keep clear of
discharge opening at all times.
WARNING: NEVER direct discharge of
material toward bystanders nor allow anyone
in front of equipment while unit is in operation.
Be familiar with area of operation.
1
2
3
1. Ring Gear Nuts
2. Half Rings
3. Discharge
Chute
OS1930
Summary of Contents for 924 Snow-Thro
Page 40: ...11 40 Model 924517 PS0891 PS0850...
Page 41: ...11 41 Model 924516 PS0672...