OPERATOR MANUAL
8
5. Preparing the Machine for the First Use_
Perform the following steps to prepare the unit before the first use.
1. Remove the
shrink wrap and styrofoam
insert behind the cylinder (12) (see figure 1).
2. Check to ensure that all of the accessory
components are with the unit:
- Cylinder (12)
- Adapter (17)
- Cylinder vapour hose (blue) (15)
- Cylinder liquid hose (red) with ball valve (16)
- Service hoses with quick couplers (5)
- User's manual
- Cylinder strap
3. Check that the cylinder (12) is already placed on the platform and properly secured with the
strap provided. Unscrew two securing M6 bolts situated on each side of the platform base
app. 3-4 mm and LOCK the locking nut, making sure that there is 3mm clearance between the
end of the safety bolt and the base of the machine.