5.
Fasten the charger station to the universal mounting plate with the M4 x
30 mounting screws using the 3 mm hex key as shown.
6.
Replace the front panel on the charger station.
4.3.2 Vertical Mounting
Follow the same procedure as for a horizontal mounting, but on a
vertical surface.
4.3.3 “Daisychaining” Electrical Installation
Connections should be made via the green power connectors located
underneath the removable front cover. The “daisychain” power circuit
contains a replaceable 10A fuse. This is also located underneath the
removable front cover.
1.
Remove the front panels of the charger stations to be connected.
2.
Using 18 AWG wire or thicker, connect the terminals as shown
overleaf, ensuring that the positive (+ve) terminals are connected
together and that the negative (-ve) terminals are connected together.