a.
Feed the bolt end of the 3700mm Upper cable
(104)
up through opening in Upper frame
(5)
. Insert
15mm bushings
(65)
into holes and attach 1st/2nd/3rd Pulley
(70)
using M10 x 65mm Allen bolt
(44)
and
M10 Aircraft nut
(63)
.
b.
Place 4th Pulley
(70)
onto the cable, Using M10 x 170mm Allen bolt
(45)
, 2 x 10mm Washers
(64)
,
M10 Aircraft nut
(63)
.
c.
Place 5th /6th Pulley
(70)
onto the cable, Using M10 x 45mm Allen bolt
(50)
, 2 x 10mm Washers
(64)
, M10 Aircraft nut
(63)
.
d.
Place 7th Pulley
(70)
onto the cable, fit 2 x Pulley covers
(71)
, 2 x Double floating pulley brackets
(17)
,M10 x 45mm Allen bolt
(50)
, 2 x 10mm Washers
(64)
, M10 Aircraft nut
(63)
.
e.
Place 8th Pulley
(70)
onto the cable,fit Floating pulley bracket
(30)
using M10 x 45mm Allen bolt
(50)
,
2 x 10mm Washers
(64)
and M10 Aircraft nut
(63)
.
Step 9
Assembly instructions
16
1st
4th
8th
3rd
5th
2nd
6th
7th
5
6
4
Summary of Contents for 241/4742
Page 34: ......