Argo AT062310B Installation Procedure Download Page 7

11

HEA

TING ELEMENTS  ENERGIZED

(ACTIV

ATION DES 

ÉLÉMENTS DE  CHAUFF

AGE)

SOURCE POWER, 240V/60HZ/1PH 3-WIRE, BY

 OTHERS

(SOURCE DU COURANT

, 240V/60HZ/1PH 3-FILS, OU AUTRES)

EQUIPMENT

 GROUNDING LUG

(TENON DE PRISE Á LA

 TERRE DE Ľ APP

AREIL)

N

NEUTRAL

 BLOCK

(BLOC NEUTRE)

WHT

 (BLANC)

WHT/BLK (BLANC/NOIR)

BLK (NOIR)

NOT

 USED

(NON UTILISÉ)

NOT

 USED

(NON UTILISÉ)

L

OFF

(FERMÉ)

120V

AC

CIRC

C1

C2

N

L

CIRC

N

120V

AC

INPUT

(ENTRÉE)

WHT

 (BLANC)

NOT

 USED

(NON UTILISÉ)

NOT

 USED

(NON UTILISÉ)

CONTROL

(COMMANDE)

RED (ROUGE)

TRANSFORMER

(TRANSFORMA

TEUR)

ON

(OUVER

T)

ARGO "A

T" ELECTRIC BOILER

SCHEMA

TIC WIRING DIAGRAM

2 ELEMENT

 BOILER,

WITH POWER BLOCK

WHT/BLK (BLANC/NOIR)

WHT

 (BLANC)

WHT/BLK (BLANC/NOIR)

WHT

 (BLANC)

L1

H2

L2

L2

H1

H2

RED (ROUGE)

LW

C

FLOW

FLOW

LW

C

RED (ROUGE)

HL

HL

TT

TT

FAUL

T

(DÉF

AILLANCE)

4

1

3

2

SAFETY

 SWITCHES

(INTERRUPTEURS DE SÉCURITÉ)

T-

T

WHT/BLK (BLANC/NOIR)

L1

H1

WHT

 (BLANC)

RT

D

SETPOINT (RÉGLAGE)

DIFFERENTIAL (DIFFÉRENTIEL)

THERMOST

AT

, BY

 OTHERS

(THERMOST

AT

, OU AUTRES)

L1

POWER BLOCK

(BLOC DE PUISSANCE)

L2

FUSE BLOCK

(BLOC DE FUSIBLE)

WIRE LEGEND / (LÉGENDE DES FILS)

-  DR

Y CONT

ACT

 WIRING (POSE DES C

Â

BLES DE CONT

ACT

 SEC)

-  120 VOL

T WIRING (POSE DES C

Â

BLES 120 VOL

T)

-  240 VOL

T WIRING (POSE DES C

Â

BLES 240 VOL

T)

-  120 VOL

T FIELD WIRING (POSE DES C

Â

BLES 120 VOL

T SUR EN CHANTIER)

-  240 VOL

T FIELD WIRING (POSE DES C

Â

BLES 240 VOL

T EN CHANTIER)

-  DR

Y CONT

ACT

 FIELD WIRING (POSE DES C

Â

BLES DE CONT

ACT

 SEC EN CHANTIER)

(DIAGRAMME SCHÉMA

TIQUE DU CÂBLAGE 

D'UNE CHAUDIÈRE À 2 ÉLÉMENTS)

HIGH LIMIT

 SAFETY

 SWITCH, AUT

O RESET

(INTERRUPTEUR DE SÉCURITÉ DE LIMITE SUPÉRIEURE, 

REMISE EN MARCHE AUT

OMA

TIQUE)

HIGH LIMIT

 SAFETY

 SWITCH, AUT

O RESET

(INTERRUPTEUR DE SÉCURITÉ DE LIMITE SUPÉRIEURE, 

REMISE EN MARCHE AUT

OMA

TIQUE)

OPTIONAL

 FLOW SWITCH, BY

 OTHERS

(INTERRUPTEUR DE DÉBIT

 - F

ACUL

TA

TIF

, OU AUTRES)

SOURCE POWER, 120V/60HZ/1PH , BY

 OTHERS

(SOURCE DU COURANT

, 120V/60HZ/1PH, OU AUTRES)

OPTIONAL

 LWCO, BY

 OTHERS

(ISPOSITIF D'ARRET

 EN CAS F

AIBLE NIVEAU D'EAU - 

FACUL

TA

TIF - OU AUTRES)

RTD W

ATER TEMPERA

TURE SENSOR

(CAPTEUR DE LA

 TEMPÉRA

TURE DE ĽEAU R

TD)

CIRCULA

TOR PUMP

, BY

 OTHERS

(POMPE DE ĽACCELER

TEUR, OU AUTRES)

CIRCULA

TOR RELA

Y

(RELAIS DU

ĽACCELER

TEUR)

FACT

OR

Y INST

ALLED JUMPERS

(CAL

VALIERS INST

ALLÉES Á ĽUSINE)

ARGO ELECTRONIC BOILER CONTROL

(COMMANDE ÉLECTRONIQUE DE LA

 CHAUDIÈRE ARGO)

ELEMENT

 #1

(ÉLÉMENT

 No1)

ELEMENT

 #1 RELA

YS

(RELAIS DE ĽÉLÉMENT

 No1)

ELEMENT

 #2

(ÉLÉMENT

 No2)

ELEMENT

 #2 RELA

YS

(RELAIS DE ĽÉLÉMENT

 No2)

 ,

!"%,02).4%$/.7()4%02%3352%3%.3)4)6%

-!

4%2)!,

7)4(",

!

#+4%8

4

./

4%

Wiring diAgrAms

figurE 7A

Summary of Contents for AT062310B

Page 1: ...ting brackets for easy wall mounting Use of lag screws or anchor bolts through holes provided or on 3 4 plywood panel On uneven walls suggested mounting surface be provided such as two 2 x 4 s Surface...

Page 2: ...p supply may be located in this area below Circulator pump should be installed on supply side pumping away 6 Install gate valves at locations shown in Figures 2 3 so any boiler servicing requiring rem...

Page 3: ...7 primary secondary piping for Multiple zoning with ZONE VALVES primary secondary piping for Multiple zoning with circulators PRIMary secondary piping figure 2 figure 3...

Page 4: ...e ends before inserting into terminal block Tighten terminal screws Do not use pump rated greater than 5 amps Thermostat Connect thermostat or zone valve end switch to terminals TT and TT Figure 4 Do...

Page 5: ...re sizes specified conform to Canadian Electrical Code Canada or National Electric Code USA and include derating for ampacity and temperature Use copper wire only Check state and local requirements Re...

Page 6: ...or will continue to be energized for 3 minutes to purge boiler After 3 minutes control will de energize circulator Circ LED turns off If during start up or during operation safety end switch opens its...

Page 7: ...TACT SEC 120 VOLT WIRING POSE DES C BLES 120 VOLT 240 VOLT WIRING POSE DES C BLES 240 VOLT 120 VOLT FIELD WIRING POSE DES C BLES 120 VOLT SUR EN CHANTIER 240 VOLT FIELD WIRING POSE DES C BLES 240 VOLT...

Page 8: ...HERS SOURCE DU COURANT 120V 60HZ 1PH OU AUTRES OPTIONAL FLOW SWITCH BY OTHERS INTERRUPTEUR DE D BIT FACULTATIF OU AUTRES THERMOSTAT BY OTHERS THERMOSTAT OU AUTRES ELEMENT 1 L MENT No1 ELEMENT 1 RELAYS...

Page 9: ...T BLK BLANC NOIR WHT BLANC FUSE BLOCK BLOC DE FUSIBLE BLK NOIR L2 L1 POWER BLOCK BLOC DE PUISSANCE 240 VOLT FIELD WIRING POSE DES C BLES 240 VOLT EN CHANTIER EN CHANTIER 120 VOLT WIRING POSE DES C BLE...

Page 10: ...NOIR WHT BLANC RED ROUGE WIRE LEGEND L GENDE DES FILS DRY CONTACT WIRING POSE DES C BLES DE CONTACT SEC 120 VOLT WIRING POSE DES C BLES 120 VOLT 240 VOLT WIRING POSE DES C BLES 240 VOLT 120 VOLT FIELD...

Page 11: ...as the pressure remains less than 25 PSIG Hydronic block is now ready to be put into service Verify hydronic block circuit breaker or switch at service 1 entrance and depending on option hydronic blo...

Page 12: ...cluded with this manual Turn off hydronic unit circuit breaker at service en 1 trance and or disconnect switch Close gate valves near inlet and outlet of hydronic 2 block noisy boiler heating element...

Reviews: