
Bus Bar Earthing Bus Zone 1 (BZ1)
18
BZ1
BZ2
BS
BR
BZ1
BZ2
BS
BR
BZ1
BZ2
BS
BR
BZ1
BZ2
BS
BR
BZ1
BZ2
BS
BR
BZ1
BZ2
BS
BR
BZ1
BZ2
BS
BR
BZ1
BZ2
BS
BR
^
^
BS = bus section panel
BR = bus riser panel
^
^
BS = bus section panel
BR = bus riser panel
Bus Bar Earthing Bus Zone 2 (BZ2)
Switching devices BS
position/
position/
position/
position/
operation
operation
operation
operation
Circuit-breaker
OFF
OFF
OFF
ON
Spring charging
charged
discharged
charged
charged
3position switch:
Disconnector
OFF
ON
ON
ON
Interlocking lever
free
free
free
blocked
Earthing switch
OFF
OFF
OFF
OFF
Interlocking lever
free
blocked
blocked
blocked
Switching devices BR
position/
position/
position/
position/
operation
operation
operation
operation
3position switch:
Disconnector
OFF
OFF
OFF
OFF
Interlocking lever
free
free
free
blocked
Earthing switch
OFF
OFF
OFF
ON
Interlocking lever
free
blocked
free
1)
free
1)
All incomer and feeder disconnectors of BZ1 must be in open position before ear thing operations can be carried out.
Switching devices BS
position/
position/
position/
position/
operation
operation
operation
operation
Circuit-breaker
OFF
OFF
OFF
ON
Spring charging
charged
discharged
charged
charged
3position switch:
Disconnector
OFF
OFF
OFF
OFF
Interlocking lever
free
free
free
blocked
Earthing switch
OFF
OFF
OFF
ON
Interlocking lever
free
blocked
free
1)
free
Switching devices BR
position/operation position/
position/
position/
operation
operation
operation
operation
3position switch:
Disconnector
OFF
ON
ON
ON
Interlocking lever
free
free
free
blocked
Earthing switch
OFF
OFF
OFF
OFF
Interlocking lever
free
blocked
blocked
blocked
1)
All incomer and feeder disconnectors of BZ2 must be in open position before ear thing operations can be carried out.