4) Then transfer the programming of all the instruments of the bus.

Important  :

From the version 2.02 of the TPIs, it is possible to transfer the programming of 

the TPIs directly from the master.

For this purpose, connect yourself on the master and click on «communication 

with the devices» and then «communication through the master» and then  

«send the configuration of all devices».

Then transfer the programming of the master.

5) Then validate the bus. For this purpose connect yourself on the master, click  

on «validate network».

This will record the configuration of the bus in order to point out any error (loss  

of a module for example).

The network must always be validated after adding / removing an instrument  

and after the modification of all the links between instruments.

3. DIMENSIONS, MOUNTING

Dimensions:............................................ 7.2 x 114 x 114 mm

Housing: ................................................. self-extinguishing of PBT

Terminals: ............................................... screwed connections (2.5mm²,

 

flexible or rigid)

Screw thread .......................................... M3

Max. tightening torque............................ 0.5Nm / 4.5in.lbs

Min. solid/stranded conductor section .... 0.2mm2 / 26 AWG

Max. solid/stranded conductor section ... 2.5mm2 / 14 AWG

Protection: .............................................. case / terminals: IP20

 

 

Mounting in switchbox: latching on symmetrical DIN rail, with footing for  

 

the distribution of the 24Vdc power supply and the communication signals.

Instructions for assembling on 35mm DIN rail according to EN 60715

Assembling of 

the footings 

on the rail

‚

BEWARE:

The polarization 

tongue is at the 

bottom.

Assembling of 

the footings 

before mounting 

on DIN rail



Summary of Contents for TPIs 2A

Page 1: ...TRUMENTATIONS AUTOMATISME Route de Brindas Parc d activit d Arbora N 2 69510 Soucieu en Jarrest FRANCE T l 04 72 31 31 30 Fax 04 72 31 31 31 Tel Intern 33 4 72 31 31 30 Fax Intern 33 4 72 31 31 31 htt...

Page 2: ...p1 Summary UE conformity declaration p2 1 INTRODUCTION p3 1 1 General features p3 1 2 Features of the analog outputs p4 2 CONFIGURATION OF THE NETWORK p4 3 DIMENSIONS MOUNTING p5 4 CONNECTINGS p7...

Page 3: ...m Before any installation or maintenance work make sure the power supply of the instrument is cut This symbole indicates that the module is protected by a double or reinforced isolation The person who...

Page 4: ...mum scan ning time is 200ms The programming is performed via the USB connector located on the front face which is to be connected to a computer of the type PC equipped with the software SlimSet 1 1 Ge...

Page 5: ...or the most on the right Click on communication with the devices and then on add the connected device to the architecture The instrument will be recognized and the software will request its position w...

Page 6: ...le The network must always be validated after adding removing an instrument and after the modification of all the links between instruments 3 DIMENSIONS MOUNTING Dimensions 7 2 x 114 x 114 mm Housing...

Page 7: ...applicable to the division 2 It must be installed in an additional protecting enveloppe ensuring a protection at least of the type IP54 The USB cable must be inserted or withdrawn only if the instrume...

Page 8: ...10K S2 0 20mA Lr 400 0 10V Lr 10K A B C D E communication 24VDC 30 LED voltage presence 8 7 6 5 1 2 3 4 A B C D E communication 24VDC 30 TPIs 4A LED voltage presence S1 0 20mA Lr 400 0 10V Lr 10K S2 0...