3-56
PR666
20. Install the shift cable support bracket and secure
with two cap screws; then tighten to 8 ft-lb and
install the E-clip securing the shift cable to the
shift arm.
PR662A
21. From the left side, connect the speed sensor con-
nector (F), stator coil connector (G), CKP sensor
(H), and gear shift position switch connector (I).
PR658A
22. Route the engine harness through the shifter sup-
port brackets as marked during disassembly and
secure with nylon cable ties.
PR591A
23. Connect the front spark plug cap and front ignition
coil; then install the front and rear injector connec-
tors (A), MAP sensor (B), parking brake warning
switch (C), reverse override switch connector (D),
and ISC valve (E).
PR595A
24. From the right side, connect the ECT sensor (A),
IAT sensor (B), fuel pump/fuel gauge connector
(C), rear ignition coil (D), and TPS connector (E).
PR594A
25. Install nylon cable ties at all locations marked
prior to removing engine; then check for correct
routing of all wiring, hoses, and cables.
Back to TOC
Back to Section TOC
Next
Back
FOR ARCTIC CAT ATV DISCOUNT PARTS CALL 606-678-9623 OR 606-561-4983
www.mymowerparts.com