5 Testing & Troubleshooting
22
5.4 Post-Installation Check List
Now that the compressor installation has been completed, ARB recommends that you take
the time to complete the following check list just to insure that you haven’t missed any of the
vital steps.
The air system has been leak tested.
The air filter position will not be exposed to moisture, dust or dirt.
All air lines and wiring have been securely cable tied to resist snagging.
Switch(es) have been securely mounted within operator reach, yet well away from danger
of accidental engagement.
Switch(es) function properly and illuminate to indicate activation.
For warranty and service purposes, please fill in the following fields and supply a copy to the
customer (if applicable).
ARB PRODUCT MODEL NUMBER:
SERIAL No:
POINT OF SALE (NAME/LOCATION):
DATE OF PURCHASE:
INSTALLATION PERFORMED BY:
DATE OF INSTALLATION:
VEHICLE MAKE:
VEHICLE MODEL:
VEHICLE YEAR OF MANUFACTURE:
______________________________
______________________________
______________________________
______________________________
______________________________
______________________________
______________________________
______________________________
______________________________