18
ADVANCED SETTINGS
"IMPLEMENT"
The geometry of the displayed implement depends on the selected basic settings (chap. 9).
10.1.3
Towed implement geometry settings (SYSTEM WITH 3-POINT HITCH REAR/FRONT)
Fig. 59
Enter farming machine measures:
- Press the arrow keys (UP, DOWN, LEFT, RIGHT) to move across different implement views.
- Confirm by pressing
OK
to enter setup.
Fig. 60
Fig. 61
• Implement upper view
- Press the arrow keys (UP, DOWN, LEFT,
RIGHT) to move across values: the description
of the selected value will appear on the display.
- Confirm by pressing
OK
to enter setup.
- Enter the value.
- Select and enter, one by one, all values.
*
Offset between connection point and application point
Application point
Connection point
- 1.50 m
NEGATIVE VALUES
The application point is
to the left of the
connection point.
Fig. 62
Application point
Connection point
+ 1.50 m
POSITIVE VALUES
The application point is to the
right of the connection point.
Fig. 63
THE CONNECTION POINT OF A SELF-PROPELLED MACHINE COINCIDES WITH THE REAR AXLE OF THE VEHICLE.
Connection point
Application point
Fig. 64
CONTINUES > > >
Par.
Exit the function
or data change
Confirm access
or data change
Scroll
(LEFT /
RIGHT)
Delete
selected
character
Data
increase /
decrease
Scroll
(UP /
DOWN)
Enter
selected
character