8
6.2
Control unit valve connection
•
System only works if connected to the 3-wire type valves.
• Use ARAG valves: use of unsuitable valves not provided by ARAG automatically voids the warranty.
ARAG is not liable for damage to the equipment, persons or animals caused by failure to observe the above instructions.
• All valve connectors must be provided with seals before being connected (Fig. 10).
• Make sure the seals are correctly fitted to avoid water infiltration when using the control unit.
Boom
section 1
Boom
section 2
Boom
section 3
Boom
section 4
Boom
section 5
Valve 1
Valve 2
Valve 3
Valve 4
Valve 5
Fig. 9
Connector 1 shall control the valve which in turn is
connected to the boom section 1, and so on with
the other valves.
Connect "connector 1" to "valve 1", and then the
other connectors with increasing numbers from left
to right
the boom section 1 is the furthest from
the machine on the left, looking at the machine
from the rear side
(Fig. 9)
.
Fig. 10
Fix the connectors to the relevant valves according to the initials
indicated in your assembly general diagram (par. 5.1 System
recommended composition)
• Remove the protection cap (
1
, Fig. 10) from the electric valve.
• Place the seal (
2
) onto the connector (
3
), and push the
connector fully on (
4
): be careful not to bend the contacts upon
insertion on the valve.
• Tighten the screw (
5
) fully home.
6.3
Hydraulic valves connection
Fig. 11
Bravo 400S LT can control up to 7 hydraulic functions through double-acting valves.
Fix the connectors to the relevant valves according to the initials indicated in your assembly general diagram (par. 5.1).
• Position seal (
1
) onto connector (
2
), then connect the latter pressing it fully home (
3
):
during this operation, take special care not to bend valve electric contacts.
• Insert screw inside connector, and screw it (
4
) until it is tightened.
The function of each switch on the hydraulic function control panel is described below.
Connect the connector marked with "DD" to the pilot valve, and then the other connectors, as specified on the table:
CONTROL
MOVEMENT
CONNECTOR
Section movement
1 - 2 - 3 - 4
Opening
1 ÷ 4 A
Closing
1 ÷ 4 C
Boom height
Opening
AA
Closing
AC
Boom locking
Opening
BA
Closing
BC
Boom leveling
Opening
CA
Closing
CC
INSTALLATION