POH
AQUILA AT01-200C
Section 4
NORMAL PROCEDURES
Document Nr.:
Issue:
Supersedes Issue:
Date:
Page:
FM-AT01-1010-106
A.02
A.01 (02.03.2020)
03.03.2021
4 - 8
b) Check coolant level: Verify coolant level in the
expansion tank
and
replenish as required. (The expansion tank must be at
least 2/3 filled or coolant has to be visible at the gauge glass.)
Verify coolant level in the
overflow
bottle
and replenish as required. (The coolant level
must be between the min. and max. markings.)
CAUTION
The coolant specification in Section 1.9.2 must be adhered to!
c) Air Intakes
CHECK if clear
d) Cooler intake (oil, water, intercooler) CHECK if free from obstructions
e) Cowling
Visual Inspection; CHECK Camloc fasteners
f) Propeller and Spinner
Visual inspection
g) Propeller blades
CHECK for cracks and other damage
8.
Left wing
a) Entire wing surface (upper and under side) Visual inspection
b) Fuel vent
CHECK if clear
c)
BAT
switch
ON
d) Stall warning
press to upper detent, warning
tone is audible
e)
BAT
switch
OFF
f) Pitot / Static tube
REMOVE cover,
CHECK if all openings are clear
g) Wing tip, NAV lights and ACL
Visual inspection
h) Aileron and inspection window
Visual inspection
i) Fuel level
CHECK with dipstick and verify
with the indicated fuel level on the
fuel gauge
j) Fuel tank filler cap
CHECK if closed
k) Flap
Visual inspection
l) Wing tie-down
DISCONNECT