POH
AQUILA AT01-200C
Section 4
NORMAL PROCEDURES
Document Nr.:
Issue:
Supersedes Issue:
Date:
Page:
FM-AT01-1010-106
A.02
A.01 (02.03.2020)
03.03.2021
4 - 4
4.3 DAILY INSPECTION
CAUTION
The daily inspection is begun by checking all 3 fuel sumps for water and contamination. This
must be done before the aircraft is moved. Otherwise the fuel in the sump may mix.
1.
Tank drain (left / right wing)
drain and visually inspect for contamination
2.
Gascolator drain
drain and visually inspect for contamination
A)
CABIN
1.
Aircraft Documentation
CHECK on board
2.
Ignition key
REMOVED
3.
ALT1/ BAT
switch
ON
4.
Annunciator (warning lights)
Press
TEST
; check all ON
5.
ALT1
switch
OFF
6.
Engine instruments
CHECK
7.
Fuel quantity
CHECK
8.
Nav Lights
switch
ON, CHECK, OFF
9.
Landing Light
switch
ON, CHECK, OFF
10.
BAT
switch
OFF
11.
ELT
CHECK operational
12.
Foreign objects
CHECK and REMOVE, when
necessary
13.
Baggage
STOWED and SECURED
14.
Canopy
CHECK condition and cleanliness